Laserfiche WebLink
PUBLICORKS PERMIT • Date: 1/29/2016 <br /> Public Works Permit#: PW1601-057 <br /> City of Everett Public Works Department <br /> ` d E7 <br /> 3200 Cedar Street Parent Permit#: C1512-001 <br /> " <br /> "<. `mak �` Everett, WA 98201 <br /> Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 2,632.70 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> SENA INVESTMENT LLC GASAN RAUF <br /> 12305 14TH DR SE <br /> EVERETT WA 98208 <br /> PHONE: PHONE: 3478039795 <br /> TAX PARCEL ID# SITE ADDRESS: 10122 7TH AVE SE A & B <br /> NEW DUPLEX <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 —4„; <br /> 4. Site Civil Work to be done per plans and Stormwater Management Questionnaire-° '__.- '--`'�-`'--"-`'n` ,•�.7 , <br /> approved by the City of Everett Public Works Department d te:d,2;/1.9/2rp1 ; moi:02� *I:co , <br /> - , _P.1.!-T'! -�, <br /> 5. Contact the City of Everett Public Works Inspector Jim Knapp at_425�339-740; '- i,u i'-,-5!- ?. ` ' �`'_ w <br /> prior to startingconstruction and with other inspection re uests. ; ,',,.-.:is 2..1 `- �' <br /> y <br /> 6. Stormwater from new impervious surfaces shall not be discharged into a combined l� r,;._) <br /> ) x,;_ l....* <br /> sewer, including a lateral line or side sewer connected to the city's combined sewer r,-., rl;., <br /> system as per EMC Chapter 14.08.180 H. '--`, <br /> 7. It is the applicant/owner's responsibility to ensure that stormwater runoff from new O <br /> impervious surfaces are managed on-site in a manner that does not adversely affect <br /> neighboring properties, including the City's R.O.W. and improvements located therein. ,__, rp:..a.tet .},.F'r-' <br /> 8. Any temporary construction related discharge to the City s sewer sy$1017 i muat It i7 r ,:xF,,r' ..a:;,a; T,F 4Oi <br /> approved and permitted by the Everett Industrial Pretreatmenviston 425 5 --2 46., a:,-, - .:- -ci , <br /> 9. Keep City streets clean at all times. No dirt, mud, rocks, or debris t'o be-tracked onto' `� r )`., .;� <br /> roadway or alley. <br /> 10. Install erosion control measures per City of Everett Standards for small parcels and <br /> remove upon completion of the project prior to final approval of this permit. 0 <br /> Public Works Permit Fee Breakdown: <br /> Erosion control $50.00 --Traffic Mitigation $2,400.00 <br /> PW Plan Review $45.90 --PW Site Inspection $91.80 <br /> Aspha paving $45.00 ACKNOWLEDGEMENT OF CONDITIONS <br /> F. <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> .t wirif,/ City of Everett from any and all claims for damages, costs,expenses,or <br /> ��.. _ �q �/� causes of action that may arise because of installation and maintenance of the <br /> �p improvement or other right-of-way use hereto applied for and further agrees to <br /> •• ed for ons.��°o , hate remove same upon notice from the City and to replace public property <br /> damage. thereby. <br /> FINAL INSPECTION ' \ ' Date <br /> 03/a(// <br /> Approved as Constructed Sig!/. re of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS •'DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLL i ION. THIS PERMIT MAY BE CANCELLED BY THE C PON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />