My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc 2/1/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
Perteet Inc 2/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 1:29:52 PM
Creation date
2/13/2018 9:11:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc
Approval Date
2/1/2018
Council Approval Date
1/24/2018
End Date
12/31/2018
Department
Transportation Services
Department Project Manager
Tom Hingson
Subject / Project Title
Park and Ride Expansion at Everett Station
Tracking Number
0001060
Total Compensation
$249,892.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT STATION PARK-AND-RIDE EXPANSION <br /> Agreement with Perteet Inc. January 2018 <br /> • Design of other site improvements,which includes:grading,circulation,paving,striping,signage, <br /> landscaping to meet CPTED recommendations,tree wells,planter areas,sidewalks,and curb ramps. <br /> • Design,engineering and specifications for site lighting,including considerations for energy efficient <br /> fixtures,foot candle layout,LED technology considerations,and consideration of consistency with <br /> Everett Transit's lighting systems on other sites is included as part of this scope of services. <br /> • Design and specifications for all necessary site signage. <br /> • The project will be reviewed and permitted by the City of Everett. <br /> • The project is not currently assumed to be pursuing Greenroads or LEED certification. <br /> • Construction management is not included in this scope of services. <br /> • Hazardous Materials investigation is not included in this scope of services.It is being handled under a <br /> separate contract with Everett Transit. <br /> DESIGN STANDARDS <br /> Design file,reports,documents,and plans prepared as part of this Scope of Services,to the extent feasible,shall be <br /> developed in accordance with the latest edition and amendments to the following documents,as of the date this <br /> Agreement is signed: <br /> • Standard Specifications for Road,Bridge,and Municipal Construction,2018 English Edition,published by <br /> WSDOT and the Washington State Chapter APWA. <br /> • Standard Plans for Road, Bridge,and Municipal Construction, (M 21-10),published by WSDOT. <br /> • 2009 Manual on Uniform Traffic Control Devices(MUTCD). <br /> • Proposed Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way(PROWAG),July 26, <br /> 2011. <br /> • 2014 Stormwater Management Manual for Western Washington (SWMMWW). <br /> • City of Everett Municipal Code. <br /> • City of Everett Design and Construction Standards and Specifications for Development(June 2017) <br /> • 2012 Low Impact Design Manual(LID Manual)may be used as guidance. <br /> • CPTED design principles. <br /> TASKS <br /> The following tasks will be performed under this scope of work: <br /> Task 1—Project Management <br /> Task 2—Survey and Basemapping <br /> Task 3—Site Configuration Alternatives Analysis(Conceptual Design) <br /> Task 4—Stormwater <br /> Task 5—Environmental Documentation and Permitting <br /> Task 6—Site Civil Design(PS&E) <br /> Task 7—Illumination System Design <br /> Task 8—Utility Coordination <br /> Task 9—Geotechnical Services <br /> Task 10—Bidding Assistance and Conformed Construction Documents <br /> 2 <br /> File location: X:\Everett,City of\Promo Efforts\20170146-Everett Station P&R Expansion\Promo\Business Development\Scope\Everett Transit Parking <br /> Lot_Scope 2018-1-10.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.