Laserfiche WebLink
EVERETT STATION PARK-AND-RIDE EXPANSION <br /> Agreement with Perteet Inc. January 2018 <br /> 4.5 Water Quality Treatment Calculations <br /> Consultant will prepare sizing calculations for the proposed water quality treatment facilities. <br /> Assumptions: <br /> • The hydrologic analysis conducted as part of this work element will be done using MGS FloodTM,a <br /> continuous simulation modeling software accepted by the Washington State Department of Ecology. <br /> Deliverables: <br /> • Water Quality Treatment calculations(to be included in the Drainage Report) <br /> 4.6 Flow Control Calculations <br /> Consultant will prepare sizing calculations for flow control(detention or infiltration)facilities. <br /> Assumptions: <br /> • The hydrologic analysis conducted as part of this work element will be done using MGS FloodTM' a <br /> continuous simulation modeling software accepted by the Washington State Department of Ecology. <br /> Deliverables: <br /> • Flow Control Calculations(to be included in the Drainage Report) <br /> 4.7 Pipe Conveyance Calculations <br /> Consultant will prepare storm pipe conveyance capacity calculations for pipe segments associated with the <br /> project site: <br /> • 60%PS&E:Prepare preliminary pipe sizing calculations, using full-flow conditions with the Manning <br /> equation and SBUH Method. <br /> • 90%PS&E:Update conveyance calculations for the Drainage Report. <br /> Deliverables: <br /> • Conveyance Calculations(to be included in Drainage Report) <br /> 4.8 Drainage Report <br /> Consultant will assemble a draft(60%)and final Drainage Report.The drainage report will include a written <br /> assessment and summary of the surface water design features on the project,summary of tables,flow control and <br /> water quality treatment calculations,pipe capacity calculations,drainage basin maps,backwater analysis <br /> (Hydraulic Grade Line),and supporting exhibits. <br /> This subtask will also include independent QA/QC reviews of the full drainage report for each submittal(60% <br /> and Final).QA/QC reviews will be conducted by senior staff. <br /> Deliverables: <br /> 8 <br /> File location: X:\Everett,City of\Promo Efforts\20170146-Everett Station P&R Expansion\Promo\Business Development\Scope\Everett Transit Parking <br /> Lot_Sc ope_2018-1-10.d ocx <br />