My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc 2/1/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
Perteet Inc 2/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 1:29:52 PM
Creation date
2/13/2018 9:11:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc
Approval Date
2/1/2018
Council Approval Date
1/24/2018
End Date
12/31/2018
Department
Transportation Services
Department Project Manager
Tom Hingson
Subject / Project Title
Park and Ride Expansion at Everett Station
Tracking Number
0001060
Total Compensation
$249,892.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT STATION PARK-AND-RIDE EXPANSION <br /> Agreement with Perteet Inc. January 2018 <br /> WSDOT/APWA standard format. Division 1 will be prepared as a joint effort between the consultant and <br /> Everett Transit. <br /> • Document Assembly <br /> Assemble all deliverables from team members into a cohesive package for delivery to Everett Transit. <br /> • A maximum of twenty-three(23)civil plans will be prepared. Plan sheets will be scaled at 1" =20'for full <br /> size drawings(22"x 34")and 1" =40'for half size drawings(11"x 17").This scale allows the most efficient <br /> breakdown of the site while providing sufficient detail to convey the design intent.The anticipated plans <br /> are as follows: <br /> o Cover(1 plan sheet) <br /> o Abbreviations(1 plan sheet) <br /> o Site Plan(1 plan sheet) <br /> o Survey Control Plan(1 plan sheet) <br /> o Site Preparation and Erosion Control(1 plan sheet) <br /> o Site Preparation and Erosion Control Detail (1 sheet) <br /> o Grading Plan (1 plan sheet) <br /> o Grading Details and Sections(2 plan sheets) <br /> o Drainage Plan(1 plan sheet) <br /> o Drainage Details and Facility Plans(3 sheets) <br /> o Composite Utility Plan(1 plan sheet) <br /> o Utility Details(1 sheet) <br /> o Paving,Signing and Channelization Plan(1 plan sheet) <br /> o Paving,Signing and Channelization Details(2 plan sheets) <br /> o Horizontal Control Plan and Points Table(2 plan sheets) <br /> o Site Illumination Plan (1 plan sheet) <br /> o Site Illumination Details(1 plan sheet) <br /> o Landscaping Plan and Details(2 plan sheets) <br /> Assumptions: <br /> • Comments on conceptual plans will be provided to the Consultant in a consolidated,non-conflicting <br /> format.Either plan markups or tabulated comments are acceptable. <br /> • The project configuration and design elements selected in the site layout alternatives analysis will not be <br /> substantially revised during the course of the design efforts. <br /> • Security system design is excluded from this scope of work. <br /> • Design will be in accordance with City of Everett Development Standards. <br /> • No additional water and sewer work will be required except for service lines as described herein. No utility <br /> main extensions will be provided. <br /> • No walls will be required as part of the project. <br /> • Light fixture type,pole height,and mast arm lengths will be provided by Everett Transit. <br /> • Everett Transit will provide boilerplate contract language to be included with the specifications. <br /> • A project opinion of cost will be prepared in Perteet standard format. <br /> 12 <br /> File location:X:\Everett,City of\Promo Efforts\20170146-Everett Station P&R Expansion\Promo\Business Development\Scope\Everett Transit Parking <br /> Lot_Scope_2018-1-10.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.