My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc 2/1/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
Perteet Inc 2/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 1:29:52 PM
Creation date
2/13/2018 9:11:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc
Approval Date
2/1/2018
Council Approval Date
1/24/2018
End Date
12/31/2018
Department
Transportation Services
Department Project Manager
Tom Hingson
Subject / Project Title
Park and Ride Expansion at Everett Station
Tracking Number
0001060
Total Compensation
$249,892.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT STATION PARK-AND-RIDE EXPANSION <br /> Agreement with Perteet Inc. January 2018 <br /> 10.2 Conformed Construction Documents <br /> If addendums are issued during the bidding process,the Consultant will prepare conformed construction <br /> documents that incorporate the changes made by addendum during the bidding process. <br /> Deliverables: <br /> • If addendums are issued,the consultant will provide one(1)hard copy and one(1)electronic copy in PDF <br /> format of conformed contract plans and specifications,as appropriate. <br /> Items to be furnished by Everett Transit <br /> • Property boundary line description for the park-and-ride site. <br /> • Everett Transit logo for use on plans. <br /> • Consolidated plan review comments at each submittal. <br /> • Specification boilerplates and front end documents. <br /> Optional Services <br /> • Public Outreach or Public Meetings <br /> • Traffic Analysis <br /> • WSDOT Permitting and Coordination <br /> • Construction Administration <br /> • Greenroads Documentation <br /> • Infiltration Pit Testing <br /> Time for Completion <br /> The following milestone dates are anticipated for the project: <br /> • NTP by 2/15/2018 <br /> • Conceptual Design by 4/10/2018 <br /> • 60%Design by 8/10/2018 <br /> • 100%Design by 10/31/2018 <br /> • IFB Bid Ready Set by 12/31/2018 <br /> Milestone deadlines are subject to change if Everett Transit or other review cycles are significantly lengthier than <br /> anticipated. <br /> 19 <br /> File location: X:\Everett,City of\Promo Efforts\20170146-Everett Station P&R Expansion\Promo\Business Development\Scope\Everett Transit Parking <br /> Lot_Scope2018-1-10.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.