Laserfiche WebLink
40-27 BUILDING <br />CAST -IN -PLACE CONCRETE I <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />3.8 WATERSTOP INSTALLATION <br />A. Self -Expanding Strip Waterstops: Install in construction joints and at other locations <br />indicated, according to manufacturer's written instructions, adhesive bonding, <br />mechanically fastening, and firmly pressing into place. Install in longest lengths <br />practicable. <br />3.9 CONCRETE PLACEMENT <br />A. Before placing concrete, verify that installation of formwork, reinforcement, and <br />embedded items is complete and that required inspections are completed. <br />B. Do not add water to concrete during delivery, at Project site, or during placement <br />unless approved by Engineer. <br />C. Before test sampling and placing concrete, water may be added at Project site, subject <br />to limitations of ACI 301. <br />Do not add water to concrete after adding high -range water -reducing admixtures <br />to mixture. <br />D. Deposit concrete continuously in one layer or in horizontal layers of such thickness that <br />no new concrete is placed on concrete that has hardened enough to cause seams or <br />planes of weakness. If a section cannot be placed continuously, provide construction <br />joints as indicated. Deposit concrete to avoid segregation. <br />1. Deposit concrete in horizontal layers of depth not to exceed formwork design <br />pressures and in a manner to avoid inclined construction joints. <br />2. Consolidate placed concrete with mechanical vibrating equipment according to <br />ACI 301. <br />3. Do not use vibrators to transport concrete inside forms. Insert and withdraw <br />vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer <br />and at least 6 inches into preceding layer. Do not insert vibrators into lower <br />layers of concrete that have begun to lose plasticity. At each insertion, limit <br />duration of vibration to time necessary to consolidate concrete and complete <br />embedment of reinforcement and other embedded items without causing mixture <br />constituents to segregate. <br />E. Deposit and consolidate concrete for floors and slabs in a continuous operation, within <br />limits of construction joints, until placement of a panel or section is complete. <br />1. Consolidate concrete during placement operations, so concrete is thoroughly <br />worked around reinforcement and other embedded items and into corners. <br />2. Maintain reinforcement in position on chairs during concrete placement. <br />3. Screed slab surfaces with a straightedge and strike off to correct elevations. <br />4. Slope surfaces uniformly to drains where required. <br />5. Begin initial floating using bull floats or darbies to form a uniform and open - <br />textured surface plane, before excess bleedwater appears on the surface. Do not <br />further disturb slab surfaces before starting finishing operations. <br />C06922.001.00 03 30 00 - 12 <br />05-22-14 ' <br />