Laserfiche WebLink
40-27 BUILDING CAST -IN -PLACE CONCRETE <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />D. Measure floor and slab flatness and levelness according to ASTM E 1155 within 36 <br />hours of finishing. <br />3.18 PROTECTION OF LIQUID FLOOR TREATMENTS <br />A. Protect liquid floor treatment from damage and wear during the remainder of <br />construction period. Use protective methods and materials, including temporary <br />covering, recommended in writing by liquid floor treatments installer. <br />END OF SECTION 03 30 00 <br />C06922.001.00 <br />033000-19 <br />05-22-14 <br />