My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-27 2022-03-17
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-27
>
3003 W CASINO RD BLDG 40-27 2022-03-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 4:21:14 PM
Creation date
2/13/2018 1:19:39 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-27
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40-27 BUILDING CAST -IN -PLACE CONCRETE <br />' <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />E. Perform structural repairs of concrete, subject to Engineer's approval, using epoxy <br />adhesive, epoxy mortar and/or polymer repair mortar. <br />F. Repair materials and installation not specified above may be used, subject to <br />' <br />Engineer's approval. <br />' <br />3.15 FIELD QUALITY CONTROL <br />A. Testing and Inspecting: Owner will engage a special inspector and qualified testing <br />and inspecting agency to perform field tests and inspections and prepare test reports. <br />B. Inspections: <br />1. Steel reinforcement placement. <br />2. Headed bolts and studs. <br />3. Verification of use of required design mixture. <br />4. Concrete placement, including conveying and depositing. <br />5. Curing procedures and maintenance of curing temperature. <br />C. Concrete Tests: Testing of composite samples of fresh concrete obtained according to <br />ASTM C 172 shall be performed according to the following requirements: <br />1. Testing Frequency: Obtain at least one composite sample for each 100 cu. yd. <br />or fraction thereof of each concrete mixture placed each day. <br />2. Water Content and Slump: AASHTO T 318; one test at point of placement for <br />each composite sample, but not less than one test for each day's pour of each <br />concrete mixture. Perform additional tests when concrete consistency appears <br />to change. <br />3. Air Content: ASTM C 231, pressure method, or ASTM C 173/C 173M, volumetric <br />method; one test for each composite sample, but not less than one test for each <br />day's pour of each concrete mixture. <br />4. Concrete Temperature: ASTM C 1064/C 1064M; one test hourly when air <br />temperature is 40 deg F and below and when 80 deg F and above, and one test <br />for each composite sample. <br />5. Flexural Test Specimens: ASTM C 31/C 31M. <br />a. Cast and laboratory cure two sets of two standard beam specimens for <br />each composite sample. <br />6. Flexural -Strength Tests: ASTM C 293; test one set of two laboratory -cured <br />specimens at 7 days for information and one set of two specimens at 28 days for <br />acceptance. <br />a. A flexural -strength test shall be the average modulus of rupture from a set <br />of two specimens obtained from same composite sample and tested at age <br />indicated. <br />7. Strength of each concrete mixture will be satisfactory if every average of any <br />three consecutive flexural -strength tests equals or exceeds specified flexural <br />strength and no flexural -strength test value falls below specified flexural strength <br />by more than 75 psi. <br />C06922.001.00 03 30 04 - 18 <br />05-22-14 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.