Laserfiche WebLink
1 <br />40-27 BUILDING PRECAST CONCRETE <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />D. Design Standards: Comply with ACI 318 and design recommendations of <br />PCI MNL 120, "PCI Design Handbook - Precast and Prestressed Concrete," applicable <br />to types of architectural precast concrete units indicated. <br />E. Quality -Control Standard: For manufacturing procedures and testing requirements, <br />quality -control recommendations, and dimensional tolerances for types of units <br />required, comply with PCI MNL 117, "Manual for Quality Control for Plants and <br />Production of Architectural Precast Concrete Products." <br />F. Welding: Qualify procedures and personnel according to AWS D1.1/D.1.1 M, <br />"Structural Welding Code - Steel"; and AWS D1.4, "Structural Welding Code - <br />Reinforcing Steel." <br />G. Calculated Fire -Test -Response Characteristics: Where indicated, provide architectural <br />precast concrete units whose fire resistance has been calculated according to <br />ACI 216.1/TMS 0216.1, "Standard Method for Determining Fire Resistance of Concrete <br />and Masonry Construction Assemblies," and is acceptable to authorities having <br />jurisdiction. <br />H. Preinstallation Conference: Conduct conference at Project site to comply with <br />requirements in Division 01 Section "Project Management And Coordination." <br />1.6 <br />DELIVERY, STORAGE, AND HANDLING <br />A. <br />Deliver precast concrete units in such quantities and at such times to limit unloading <br />units temporarily on the ground. <br />B. <br />Support units during shipment on nonstaining shock -absorbing material. <br />' <br />C. <br />Store units with adequate dunnage and bracing and protect units to prevent contact <br />with soil, to prevent staining, and to prevent cracking, distortion, warping or other <br />physical damage. <br />D. <br />Place stored units so identification marks are clearly visible, and units can be <br />inspected. <br />E. <br />Handle and transport units in a position consistent with their shape and design in order <br />' <br />to avoid excessive stresses which would cause cracking or damage. <br />F. <br />Lift and support units only at designated points shown on Shop Drawings. <br />' 1.7 SEQUENCING <br />A. Furnish loose connection hardware and anchorage items to be embedded in or <br />attached to other construction without delaying the Work. Provide locations, setting <br />' diagrams, templates, instructions, and directions, as required, for installation. <br />IC06922.001.00 <br />034500-3 <br />05-22-14 <br />