My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-27 2022-03-17
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-27
>
3003 W CASINO RD BLDG 40-27 2022-03-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 4:21:14 PM
Creation date
2/13/2018 1:19:39 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-27
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40-27 BUILDING STRUCTURAL STEEL FRAMING <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />' <br />D. <br />Mill test for including <br />reports structural steel, chemical and physical properties. <br />E. <br />Product Test Reports: For the following: <br />1. Bolts, nuts, and washers including mechanical properties and chemical analysis. <br />2. Direct -tension indicators. <br />3. Tension -control, high -strength, bolt -nut -washer assemblies. <br />4. Shear stud connectors. <br />5. Shop primers. <br />6. Nonshrink grout. <br />1.8 <br />QUALITY ASSURANCE <br />A. <br />Fabricator Qualifications: A qualified fabricator that participates in the AISC Quality <br />Certification Program and is designated an AISC-Certified Plant, Category STD, or is <br />' <br />accredited by the IAS Fabricator Inspection Program for Structural Steel (AC 172). <br />B. <br />Installer Qualifications: A qualified installer who participates in the AISC Quality <br />Certification Program and is designated an AISC-Certified Erector, Category ACSE. <br />C. <br />Welding Qualifications: Qualify procedures and personnel according to <br />' <br />AWS D1.1/D1.1M, "Structural Welding Code - Steel." <br />1. Welders and welding operators performing work on bottom -flange, demand - <br />critical welds shall pass the supplemental welder qualification testing, as required <br />by AWS D1.8/D1.8M. FCAW-S and FCAW-G shall be considered separate <br />processes for welding personnel qualification. <br />D. <br />Comply with applicable provisions of the following specifications and documents: <br />1. AISC 303. <br />2. AISC 341 and AISC 341s1. <br />3. AISC 360. <br />4. RCSC's "Specification for Structural Joints Using ASTM A 325 or A 490 Bolts." <br />1.9 <br />DELIVERY, STORAGE, AND HANDLING <br />' <br />A. <br />Store materials to permit easy access for inspection and identification. Keep steel <br />members off ground and spaced by using pallets, dunnage, or other supports and <br />spacers. Protect steel members and packaged materials from corrosion and <br />deterioration. <br />1. Do not store materials on structure in a manner that might cause distortion, <br />damage, or overload to members or supporting structures. Repair or replace <br />damaged materials or structures as directed. <br />' <br />B. <br />Store fasteners in a protected place in sealed containers with manufacturer's labels <br />intact. <br />C06922.001.00 05 12 00 - 3 <br />' <br />05-22-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.