Laserfiche WebLink
' 40-27 BUILDING <br />STRUCTURAL STEEL FRAMING <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />C. Ultrasonic Inspection: ASTM E 164. <br />d. Radiographic Inspection: ASTM E 94. <br />E. In addition to visual inspection, test and inspect field -welded shear connectors <br />according to requirements in AWS D1.1/D1.1 M for stud welding and as follows: <br />1. Perform bend tests if visual inspections reveal either a less -than -continuous 360- <br />degree flash or welding repairs to any shear connector. <br />3.6 REPAIRS AND PROTECTION <br />A. Galvanized Surfaces: Clean areas where galvanizing is damaged or missing and repair <br />galvanizing to comply with ASTM A 780/A 780M. <br />B. Touchup Painting: Immediately after erection, clean exposed areas where primer is <br />damaged or missing and paint with the same material as used for shop painting to <br />comply with SSPC-PA 1 for touching up shop -painted surfaces. <br />1. Clean and prepare surfaces by SSPC-SP 2 hand -tool cleaning or SSPC-SP 3 <br />power -tool cleaning. <br />END OF SECTION 05 12 00 <br />C06922.001.00 <br />051200-11 <br />05-22-14 <br />