My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-27 2022-03-17
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-27
>
3003 W CASINO RD BLDG 40-27 2022-03-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 4:21:14 PM
Creation date
2/13/2018 1:19:39 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-27
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 40-27 BUILDING <br />CLOSEOUT PROCEDURES <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />SECTION 01 77 00 - CLOSEOUT PROCEDURES <br />IPART 1 - GENERAL <br />' 1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and <br />1 Supplementary Conditions and other Division 01 Specification Sections, apply to this <br />Section. <br />1.2 SUMMARY <br />A. Section includes administrative and procedural requirements for contract closeout, <br />including, but not limited to, the following: <br />' 1. Substantial Completion procedures. <br />2. Final completion procedures. <br />3. Warranties. <br />4. Final cleaning. <br />B. Related Requirements: <br />1. Division 01 Section "Operation and Maintenance Data" for operation and <br />maintenance manual requirements. <br />2. Division 01 Section "Project Record Documents" for submitting record Drawings, <br />' record Specifications, and record Product Data. <br />3. Divisions 02 through 33 Sections for specific closeout and special cleaning <br />requirements for the Work in those Sections. <br />' 1.3 SUBSTANTIAL COMPLETION PROCEDURES <br />' A. Contractor's List of Incomplete Items: Prepare and submit a list of items to be <br />completed and corrected (Contractor's punch list), indicating the value of each item on <br />the list and reasons why the Work is incomplete. <br />' B. Submittals Prior to Substantial Completion: Complete the following a minimum of 10 <br />days prior to requesting inspection for determining date of Substantial Completion. List <br />' items below that are incomplete at time of request. <br />1. Certificates of Release: Obtain and submit releases from authorities having <br />' jurisdiction permitting Owner unrestricted use of the Work and access to services <br />and utilities. Include occupancy permits, operating certificates, and similar <br />releases. <br />2. Submit closeout submittals specified in other Division 01 Sections, including <br />' project record documents, operation and maintenance manuals, final completion <br />construction photographic documentation, damage or settlement surveys, <br />property surveys, and similar final record information. <br />C06922.001.00 01 77 00 - 1 <br />' 05-22-14 <br />