My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-27 2022-03-17
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-27
>
3003 W CASINO RD BLDG 40-27 2022-03-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 4:21:14 PM
Creation date
2/13/2018 1:19:39 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-27
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 40-27 BUILDING CLOSEOUT PROCEDURES <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />1.4 FINAL COMPLETION PROCEDURES <br />' A. Submittals Prior to Final Completion: Before requesting final inspection for determining <br />final completion, complete the following: <br />' 1. Submit a final Application for Payment according to Division 01 Section "Payment <br />Procedures." <br />2. Certificate of Insurance: Submit evidence of final, continuing insurance coverage <br />complying with insurance requirements. <br />1.5 LIST OF INCOMPLETE ITEMS (PUNCH LIST) <br />A. Organization of List: Include name and identification of each space and area affected <br />by construction operations for incomplete items and items needing correction including, <br />if necessary, areas disturbed by Contractor that are outside the limits of <br />construction. Use CSI Form 14.1A. <br />1. Organize list of spaces in sequential order, starting with exterior areas first and <br />proceeding from lowest floor to highest floor. <br />2. Organize items applying to each space by major element, including categories <br />for ceiling, individual walls, floors, equipment, and building systems. <br />3. Include the following information at the top of each page: <br />a. Project name. <br />' b. Date. <br />C. Name of Architect and Owner's Representative. <br />d. Name of Contractor. <br />' e. Page number. <br />4. Submit list of incomplete items in the following format: <br />a. MS Excel electronic file. Architect, through Owner's Representative, will <br />return annotated file. <br />b. PDF electronic file. Architect, through Owner's Representative, will return <br />' annotated file. <br />C. Three paper copies. Architect, through Owner's Representative, will return <br />two copies. <br />1 <br />1.6 SUBMITTAL OF PROJECT WARRANTIES <br />' A. Time of Submittal: Submit written warranties on request of Architect for designated <br />portions of the Work where commencement of warranties other than date of <br />' Substantial Completion is indicated, or when delay in submittal of warranties might limit <br />Owner's rights under warranty. <br />B. Partial Occupancy: Submit properly executed warranties within 15 days of completion <br />' of designated portions of the Work that are completed and occupied or used by Owner <br />during construction period by separate agreement with Contractor. <br />C06922.001.00 01 77 00 - 3 <br />' 05-22-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.