Laserfiche WebLink
40-27 BUILDING <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />SECTION 01 78 39 - PROJECT RECORD DOCUMENTS <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />PROJECT RECORD DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and <br />Supplementary Conditions and other Division 01 Specification Sections, apply to this <br />Section. <br />1.2 SUMMARY <br />A. Section includes administrative and procedural requirements for project record <br />documents, including the following: <br />1. Record Drawings. <br />2. Record Specifications. <br />3. Record Product Data. <br />4. Miscellaneous record submittals. <br />B. Related Requirements: <br />1. Division 01 Section "Closeout Procedures" for general closeout procedures. <br />2. Division 01 Section "Operation and Maintenance Data" for operation and <br />maintenance manual requirements. <br />3. Divisions 02 through 33 Sections for specific requirements for project record <br />documents of the Work in those Sections. <br />1.3 CLOSEOUT SUBMITTALS <br />A. Record Drawings: Comply with the following: <br />1. Number of Copies: Submit one set of marked -up record prints. <br />2. Number of Copies: Submit copies of record Drawings as follows: <br />a. Initial Submittal: <br />1) Submit one paper -copy set of marked -up record prints. <br />2) Submit PDF electronic files of scanned record prints and one of file <br />prints. <br />3) Submit record digital data files and one set of plots. <br />4) Architect will indicate whether general scope of changes, additional <br />information recorded, and quality of drafting are acceptable. <br />C06922.001.00 <br />01 78 39 - 1 <br />05-22-14 <br />