My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-27 2022-03-17
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-27
>
3003 W CASINO RD BLDG 40-27 2022-03-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 4:21:14 PM
Creation date
2/13/2018 1:19:39 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-27
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 40-27 BUILDING <br />CAST -IN -PLACE CONCRETE <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />SECTION 03 30 00 - CAST -IN -PLACE CONCRETE <br />PART 1 - GENERAL <br />' <br />1.1 <br />A <br />1.2 <br />' <br />A <br />' <br />1.3 <br />RELATED DOCUMENTS <br />Drawings and general provisions of the Contract, including General and <br />Supplementary Conditions and Division 01 Specification Sections, apply to this <br />Section. <br />SUMMARY <br />Section includes cast -in -place concrete, including formwork, reinforcement, concrete <br />materials, mixture design, placement procedures, and finishes. <br />DEFINITIONS <br />' A. Cementitious Materials: Portland cement alone or in combination with one or more of <br />the following: blended hydraulic cement, fly ash, slag cement, other pozzolans, and <br />silica fume; materials subject to compliance with requirements. <br />B. W/C Ratio: The ratio by weight of water to cementitious materials. <br />1.4 PREINSTALLATION MEETINGS <br />A. Preinstallation Conference: Conduct conference at Project site. <br />1. Before submitting design mixtures, review concrete design mixture and examine <br />procedures for ensuring quality of concrete materials. Require representatives of <br />each entity directly concerned with cast -in -place concrete to attend, including the <br />following: <br />a. Contractor's superintendent. <br />b. Independent testing agency responsible for concrete design mixtures. <br />C. Ready -mix concrete manufacturer. <br />d. Concrete Subcontractor. <br />2. Review special inspection and testing and inspecting agency procedures for field <br />quality control, concrete finishes and finishing, cold- and hot -weather concreting <br />procedures, curing procedures, [construction contraction and isolation joints, and <br />joint -filler strips, semirigid joint fillers, forms and form removal limitations, shoring <br />and reshoring procedures, vapor -retarder installation, anchor rod and anchorage <br />device installation tolerances, steel reinforcement installation, methods for <br />achieving specified floor and slab flatness and levelness, floor and slab flatness <br />and levelness measurement, concrete repair procedures, and concrete <br />protection. <br />C06922.001.00 03 30 00 - 1 <br />1 <br />05-22-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.