Laserfiche WebLink
40-27 BUILDING <br />CAST -IN -PLACE CONCRETE I <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />2. Maximum W/C Ratio: 0.50. <br />3. Slump Limit: 4 inches, plus or minus 1 inch. <br />4. Air Content (exposed exterior concrete only): 5.5 percent, plus or minus 1.5 <br />percent at point of delivery for 1-1/2-inch nominal maximum aggregate size. <br />B. Tunnel Bases, Walls and Tops: Normal -weight concrete. <br />1. Minimum Compressive Strength: 5000 psi at 28 days. <br />2. Maximum W/C Ratio: 0.45. <br />3. Slump Limit: 4 inches, plus or minus 1 inch. <br />4. Air Content (exposed exterior concrete only): 5.5 percent, plus or minus 1.5 <br />percent at point of delivery for 1-1/2-inch nominal maximum aggregate size. <br />C. Suspended Slabs: Normal -weight concrete. <br />1. Minimum Compressive Strength: 4000 psi at 28 days. <br />2. Maximum W/C Ratio: 0.50. <br />3. Minimum Cementitious Materials Content: 520 lb/cu. yd. <br />4. Slump Limit: 4 inches, plus or minus 1 inch. <br />5. Air Content: Do not allow air content of trowel -finished floors to exceed 3 percent. <br />D. Building Frame Members: Normal -weight concrete. <br />1. Minimum Compressive Strength: 4000 psi at 28 days. <br />2. Maximum W/C Ratio: 0.50. <br />3. Slump Limit: 4 inches, plus or minus 1 inch. <br />E. Exterior Concrete: Normal -weight concrete. <br />1. Minimum Compressive Strength: 5000 psi at 28 days. <br />2. Maximum W/C Ratio: 0.45. <br />3. Slump Limit: 4 inches, plus or minus 1 inch. <br />4. Air Content: 5.5 percent, plus or minus 1.5 percent at point of delivery for 1-1/2- <br />inch nominal maximum aggregate size. <br />2.13 FABRICATING REINFORCEMENT <br />A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice." <br />2.14 CONCRETE MIXING <br />A. Ready -Mixed Concrete: Measure, batch, mix, and deliver concrete according to <br />ASTM C 94/C 94M, and furnish batch ticket information. <br />1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery <br />time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, <br />reduce mixing and delivery time to 60 minutes. <br />C06922.001.00 03 30 00 - 8 <br />05-22-14 , <br />