My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Barbara Davis 2/12/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
Barbara Davis 2/12/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2018 10:20:41 AM
Creation date
2/15/2018 10:20:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Barbara Davis
Approval Date
2/12/2018
End Date
12/31/2018
Department
Administration
Department Project Manager
Hil Kaman
Subject / Project Title
Meeting Facilitator
Tracking Number
0001063
Total Compensation
$1,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A-Scope of Work <br /> 1. Planning meetings with staff <br /> Pre and post meeting planning throughout the process; includes meeting at end of process to create <br /> plan on how to proceed towards self-facilitated group. <br /> 2. Stakeholder group meetings <br /> • Meeting design and agenda planning <br /> • Meeting facilitation <br /> Based on facilitating up to three on-site meetings of 1.5 hours each; includes being on site 1/2 hour before <br /> and after each meeting. Includes personal planning time for meeting design to achieve desired <br /> outcomes and creation of appropriate agenda for each meeting. <br /> 3§F <br /> } <br />
The URL can be used to link to this page
Your browser does not support the video tag.