Laserfiche WebLink
Exhibit A-Scope of Work <br /> 1. Planning meetings with staff <br /> Pre and post meeting planning throughout the process; includes meeting at end of process to create <br /> plan on how to proceed towards self-facilitated group. <br /> 2. Stakeholder group meetings <br /> • Meeting design and agenda planning <br /> • Meeting facilitation <br /> Based on facilitating up to three on-site meetings of 1.5 hours each; includes being on site 1/2 hour before <br /> and after each meeting. Includes personal planning time for meeting design to achieve desired <br /> outcomes and creation of appropriate agenda for each meeting. <br /> 3§F <br /> } <br />