My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Synagro West LLC 2/14/2018
>
Contracts
>
Capital Contract
>
Synagro West LLC 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 9:06:30 AM
Creation date
2/15/2018 10:59:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Synagro West LLC
Approval Date
2/14/2018
Council Approval Date
1/31/2018
Department
Finance
Department Project Manager
Chris Chesson
Subject / Project Title
2018 Biosolids Removal and Disposal
Public Works WO Number
2600 4 1
Tracking Number
0001066
Total Compensation
$1,338,259.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Synagro West LLC 7/31/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUBCONTRACTORS <br /> 1. List the names of the subcontractors with whom the bidder will subcontract if awarded the contract. <br /> Bidder may name itself any or all of the work, including one or more categories of work <br /> 2. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) and <br /> electrical work (as defined by RCW Chap. 19.28), Bidder MUST either identify itself or <br /> subcontractors. If Bidder believes such work is not part of the scope of work, Bidder shall <br /> write"NO WORK". <br /> 3. For all other types and scope of work, the City will assume the bidder will peifonn with its own <br /> forces any and all types and scope of work for which a subcontractor is not identified. <br /> 4. Bidder shall not list more than one subcontractor for each category of work identified, unless <br /> subcontractors vary with bid alternates, in which case the bidder must indicate which subcontractor <br /> will be used for which alternate. <br /> 5. Bidder's bid shall be deemed nonresponsive and void if: <br /> A. (For heating, ventilation, air conditioning, plumbing and electrical work) Bidder fails to <br /> submit as part of the bid the names of such subcontractors or to name itself to perform such <br /> work or writes "No Work"; or <br /> B. Bidder names two or more subcontractors to perform the same work. <br /> 6. The requirement to name the bidder's proposed heating, ventilation and air conditioning, plumbing, <br /> and electrical subcontractors applies only to proposed heating, ventilation and air conditioning, <br /> plumbing, and electrical subcontractors who will contract directly with the general contractor <br /> submitting the bid to the City. <br /> Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br /> HEATING <br /> Subcontractor,bidder or"no work"MUST be Not Applicable <br /> stated <br /> VENTILATION AND AIR CONDITIONING <br /> Subcontractor,bidder or"no work"MUST be Not Applicable <br /> stated <br /> PLUMBING(as described in RCW Chap. 18.106) <br /> Subcontractor,bidder or"no work"MUST be Not Applicable <br /> stated <br /> ELECTRICAL(as described in RCW Chap. 19.28) <br /> Subcontractor, bidder or "no work" MUST be Not Applicable <br /> stated <br /> OMA Construction, Inc. <br /> Transportation <br /> P 0 Bnx 3705, Seattle, WA 98124 <br /> 2018 Biosolids Removal and Disposal DIVISION P,P-6 November 1,2017 <br /> WORK ORDER#2600-4-1 <br /> Page 11 Subcontractors <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.