My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> specific so as to allow the Owner to mitigate or avoid increased costs, time of performance, <br /> damages or injury. Contractor's failure to provide such Notice in a timely way shall be deemed a <br /> waiver and release of any and all Contract Claims relating to, arising out of, or caused by, any <br /> alleged interference, difficulty or problem with another contractor or worker engaged by the <br /> 1 Owner. <br /> • <br /> ARTICLE 5 PROGRESS AND COMPLETION <br /> 5.1 Notice to Proceed <br /> A. Following execution of the Contract by the Owner, the Owner or Owner's Representative will <br /> give the Contractor a written Notice to Proceed. Notwithstanding other provisions of the <br /> Contract, the Contractor shall not be obligated to perform Work, and the Owner will not be <br /> obligated to accept or pay for Work performed by the Contractor or be liable for any Delays,prior <br /> to delivery of the Notice to Proceed. The Owner's knowledge of Work being performed prior to <br /> delivery of the Notice to Proceed will not obligate the Owner to accept or pay for such Work. <br /> Contractor waives any and all Contract Claims for an adjustment of Contract Sum and Contract <br /> Time arising out of, or related to, work it performs prior to receipt of the Notice to Proceed. The <br /> ' Owner may issue partial Notices to Proceed. <br /> 5.2 Contract Time <br /> A. General <br /> 1. TIME IS OF THE ESSENCE IN PERFORMING THE CONTRACT. <br /> a. Failure to complete the Project within the contractually specified time may affect other <br /> Projects and Owner activities. Contract Time starts upon the later of the issuance of the <br /> Notice to Proceed or a date specified in the Notice to Proceed. The Contractor shall <br /> ' promptly start the Work as soon as possible after the date of the Notice to Proceed and <br /> shall prosecute the Work so that the various portions of the Project shall be completed <br /> in accordance with the Contract Time period. Contractor shall perform its work at such <br /> times and in such ways that the Work is not damaged by weather such as wind, rain, or <br /> snow. Contractor shall correct or repair at its sole expense any Work damaged by <br /> weather, irrespective of whether such damage is covered by insurance. No portions of <br /> the Work where acceptable quality will be affected shall be constructed while • <br /> unfavorable conditions exist. By bidding on the Project and executing a Contract to <br /> perform the Work, Contractor agrees the contractually required completion dates are <br /> feasible, reasonable, and achievable for the Contract Sum. Contractor represents that it <br /> ' has considered all factors relevant to its price and achieving the Completion Dates, <br /> including, but not limited to, weather, Site access, labor conditions and the availability <br /> of materials, supplies and Equipment. Compliance with ARTICLE 10. NOTICE TO <br /> ' OWNER, ARTICLE 12. CONTRACT CLAIMS, and 5.B. Construction Schedule <br /> are conditions precedent to a request for, consideration of, and grant of, any extension <br /> of Contract Time. Failure to request a time extension in the manner and in the time <br /> required by this section, and the Specifications referred to herein, constitutes a waiver <br /> by the Contractor of any and all entitlement to an extension of time and any adjustment <br /> of Contract Sum arising out, or related to, such Delay. <br /> ' B. Construction Schedule <br /> 1. General <br /> I <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 -21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.