My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> ' SPECIAL PROVISIONS GENERAL CONDITIONS <br /> of the Work within the Contract Time. Review by the Owner or Owner's <br /> Representative shall not constitute approval or acceptance of the Contractor's <br /> construction means, methods, sequencing, logic, order, precedence and succession of <br /> activities or Contractor's ability to complete the Work in a timely manner. Any <br /> mistakes or errors in any schedule, including, but not limited to, mistakes or errors of <br /> logic, order, precedence, and duration, are and remain the Contractor's. The Owner or <br /> Owner's Representative may comment upon the schedule. <br /> C. Extensions of Contract Time <br /> 1. Any requests for extensions in Contract Time, whether resulting from Extra Work directed <br /> by the Owner or not, shall be accompanied by an analysis of schedules using the critical path <br /> ' method. This analysis shall include an updated schedule, an as-planned schedule, an as-built <br /> schedule, a but-for schedule, and narrative explaining the alleged causes, schedule impacts <br /> and all costs related to or arising out of the proposed extension. Any requests for extensions <br /> of Contract Time by the Contractor shall be submitted in accordance with these General <br /> Conditions. Extensions of Contract Time will be granted only as provided in the General <br /> Conditions and to the extent that affected critical activities exceed the Total Float time along <br /> ' the affected paths of the reviewed Preliminary Schedule at the time the change was <br /> authorized in writing by the Owner. Contractor has the burden of clearly and convincingly <br /> demonstrating entitlement to any adjustment of Contract Time. <br /> 2. If the Owner is solely responsible for any Delay to Substantial Completion, Physical <br /> Completion, Completion Date, or Final Acceptance, the Contractor shall only be entitled to <br /> compensation or other damages as described in 12.4 Remedies, provided that Contractor <br /> timely gave Notice pursuant to ARTICLE 10. NOTICE TO OWNER, timely submitted a <br /> Contract Claim pursuant to ARTICLE 12. CONTRACT CLAIMS and fulfilled the <br /> requirements of 5.B. Construction Schedule. <br /> ' D. Construction Progress <br /> 1. The Contractor shall furnish all labor,materials, facilities and Equipment necessary to insure <br /> the prosecution and completion of the Project within the interim milestones, Substantial <br /> Completion, Physical Completion and Completion Dates of the Contract. If Work falls <br /> seven (7) days or more behind the reviewed Preliminary Schedule, the Contractor agrees <br /> that, at its sole cost and expense, it will take all actions necessary to return the Project to the <br /> accepted schedule. These actions may include the following: <br /> a. Increase labor in quantities and crafts. <br /> b. Increase the number of working hours per shift, shifts per working day, working days <br /> per week, or the amount of Equipment,or any combination of the foregoing. <br /> c. Reschedule activities. <br /> 2. If requested by the Owner's Representative, the Contractor shall prepare a proposed <br /> schedule revision demonstrating a plan to make up the lag in progress and insure completion <br /> of the Work within the Contract Time. All actions taken to return the Project to the accepted <br /> schedule are at the Contractor's expense. <br /> ' 3. The Contractor shall pay all costs incurred by the Owner that result from the Contractor's <br /> action to return the Project to its accepted schedule, including, but not limited to, additional, <br /> overtime, or third party inspection, design and construction management service costs. <br /> ' Contractor agrees that Owner shall deduct such charges from payments due the Contractor. <br /> It is further understood and agreed that none of the services performed by the Owner's <br /> Representative in monitoring, reviewing and reporting Project status and progress shall <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> ' WO#UP3620 00 72 13 -23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.