Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS I <br /> 3. The name of each Owner's individual, official, or employee involved in or knowledgeable <br /> about the Contract Claim. <br /> 4. The specific provisions of the Contract that support the Contract Claim and a statement of <br /> the reasons why such provisions support the Contract Claim. <br /> 5. If the Contract Claim relates to a decision of the Owner's Representative that the Contract I <br /> leaves to the Owner's Representative's discretion or as to which the Contract provides that <br /> the Owner Representative's decision is final, the Contractor shall set out in detail all facts <br /> supporting its position relating to the decision of the Owner's Representative. <br /> 6. Identification of any documents and the substance of any oral communications that support <br /> the Contract Claim. <br /> 7. Copies of any identified documents that support the Contract Claim, other than Owner <br /> documents and documents previously furnished to the Owner by the Contractor. Standard <br /> industry manuals may be incorporated by reference. <br /> 8. If Contractor seeks an extension of Contract Time: <br /> a. The specific amount of time(including days and dates)sought. <br /> b. The specific reasons the Contractor believes an extension of Contract Time should be <br /> granted, including, but not limited to, compliance with the requirements of 5.2.C. <br /> Extensions of Contract Time; and <br /> c. The specific provisions of the Contract Documents under which it is sought. <br /> 9. If additional compensation is sought, the exact amount sought and a breakdown of that <br /> amount into the following categories: <br /> a. Labor <br /> b. Materials <br /> c. Direct Equipment. The actual cost for each piece of equipment for which a Contract <br /> Claim is made or in the absence of actual cost, the rates established by the <br /> AGC/WSDOT Equipment Rental Agreement that was in effect when the work was <br /> performed. In no case shall the amounts sought or paid for each piece of equipment <br /> exceed the rates established by the Equipment Rental Agreement even if the actual cost <br /> for such equipment is higher. The Owner may audit the Contractor's cost records to <br /> determine actual equipment cost. The following information shall be provided for each <br /> piece of equipment: <br /> 1) Detailed description (e.g., Motor Grader Diesel Powered Caterpillar 12 "G", <br /> Tractor Crawler ROPS&Dozer Included Diesel) <br /> 2) The hours of use or standby; and <br /> 3) The specific day and dates of use or standby; <br /> 4) Job Overhead. <br /> 5) Overhead(general and administrative). <br /> 6) Subcontractor's contract claims (in the same level of detail as specified herein is <br /> required for all Subcontractor's contract claims); and <br /> 7) Other categories as specified by the Contractor or the Owner. <br /> 10. A notarized statement shall be submitted to the Owner's Representative containing the <br /> following language: <br /> Under the penalty of law for perjury or falsification,the undersigned, <br /> (name) (title) i <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 - 54 <br />