My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS I <br /> 3. Within ten(10)days upon Owner's written request,the Contractor shall deliver to the Owner <br /> certified copies of all policies of insurance and the receipts for payment of premiums <br /> thereon. <br /> 4. The Owner acknowledges that Contractor may pay its premium on a monthly basis, and may <br /> not be able to provide complete evidence of payment of premiums until the final premium is <br /> paid. <br /> N. Coverages and Limits <br /> 1. General <br /> a. The insurance shall provide the minimum coverages and limits set forth in 15.3.N.2 <br /> below. <br /> b. Owner does not warrant or represent that such coverages and limits are appropriate or <br /> adequate to protect the Contractor. Providing coverage in these stated minimum limits <br /> shall not be construed to relieve the Contractor from liability in excess of such limits. <br /> c. All deductibles must be disclosed and are subject to approval by the Owner. <br /> d. The cost of any claim payments falling within the deductible shall be the sole <br /> responsibility of the Contractor. <br /> 2. CGL <br /> a. A policy of Commercial General Liability Insurance, written on an insurance industry <br /> standard occurrence form: (CG 00 01) or equivalent, including all the usual coverage <br /> known as: <br /> 1) Per Project aggregate endorsement(CG2503) <br /> 2) Premises/Operations Liability <br /> 3) Products/Completed Operations — for a period of one year following Final <br /> Acceptance. <br /> 4) Personal/Advertising Injury <br /> 5) Contractual Liability <br /> 6) Independent Contractors Liability <br /> 7) Stop Gap or Employers Contingent Liability <br /> 8) Explosion, Collapse, or Underground(XCU), (as applicable) <br /> 9) Liquor Liability/Host Liquor Liability(as applicable) <br /> 10) Fire Damage Legal <br /> 11) Blasting(as applicable) <br /> b. Coverage for 8), 9), and 11) are only required when the Contractor's Work under this <br /> agreement includes exposures to which these specified coverage respond. <br /> c. If the Contract requires working over water, the following additional coverages are <br /> required: <br /> 1) Watercraft, owned and non-owned <br /> 2) U.S. Harborworkers'/Longshoremen and Jones Act <br /> 3. Builders' Risk ' <br /> a. The Contractor shall provide property insurance under an "All Risk Builder's Risk" <br /> form in an amount equal to the value of the structure. <br /> b. The structure shall have All Risk Builders Risk Insurance inclusive of earthquake and <br /> flood subject to customary industry deductibles. <br /> 4. Other Coverages <br /> a. Other additional coverages that may be required will be listed in the Specifications. <br /> 5. Limits <br /> p <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 -64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.