My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS I <br /> 2. The Contractor, Subcontractors, or lower tier Subcontractors shall provide adequate <br /> facilities,reasonably acceptable to auditor, for the audit during normal business hours. <br /> 3. The Contractor, Subcontractors, or lower tier Subcontractors shall make a good faith effort <br /> to cooperate with the auditors. <br /> 4. If an audit is to be commenced more than sixty (60) days after the Final Acceptance date of <br /> the Contract, the Contractor will be given twenty (20) days' notice of the time when the <br /> audit is to begin. <br /> 5. If any litigation, claim, or audit arising out of, in connection with, or related to this Contract <br /> is initiated, the Project records shall be retained until the later of(a) completion of litigation, <br /> claim, or audit or(b) six years after the date of Final Acceptance. <br /> 17.2 Claims <br /> A. All Contract Claims filed against the Owner shall be subject to audit at any time following the <br /> filing of the Contract Claim. <br /> B. Failure of the Contractor, Subcontractors, or lower tier Subcontractors to maintain and retain <br /> sufficient records to allow the auditors to verify all or a portion of the Contract Claim or to permit <br /> the auditor access to the books and records of the Contractor, Subcontractors, or lower tier <br /> Subcontractors shall constitute a waiver of a Contract Claim and shall bar any recovery <br /> thereunder. <br /> 17.3 Required Documentation for Audits <br /> A. As a minimum,the auditors shall have available to them the following documents: <br /> 1. Daily time sheets and supervisor's daily reports. 'I <br /> 2. Collective Bargaining Agreements. <br /> 3. Insurance,welfare, and benefit records. I <br /> 4. Payroll registers. <br /> 5. Earnings records. I <br /> 6. Payroll tax forms. <br /> 7. Material invoices and requisitions. <br /> 8. Material cost distribution worksheet. <br /> 9. Equipment records (list of company equipment,rates,etc.) <br /> 10. Vendors',rental agencies', Subcontractors' and lower tier Subcontractors' invoices. �1 <br /> 11. Contracts between the Contractor and each of its Subcontractors, and all lower tier <br /> Subcontractor contracts and Supplier contracts. <br /> 12. Subcontractors' and lower tier Subcontractors' payment certificates. <br /> 13. Canceled checks(payroll and vendors). I <br /> 14. Job cost reports, including monthly totals. <br /> 15. Job payroll ledger. <br /> 16. General ledger. <br /> 17. Cash disbursements journal. <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 -68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.