My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 111 D. Workers should reframe from smoking on the site, wash hands regularly and wash boots and <br /> clothes. <br /> E. Wash down tools and equipment leaving the site. <br /> ' F. Become familiar with the Washington Department of Labor and Industries' rules to protect <br /> workers from arsenic in the workplace. <br /> G. Get all pertinent information regarding the Everett Smelter Cleanup Site and working in this <br /> area at the Washington State Department of Ecology website at: <br /> http://ecy2.wa.gov/programs/tcp/sites_brochure/asarco/es_main.html <br /> 1.11 TEMPORARY UTILITIES FOR CONSTRUCTION PURPOSES <br /> The CONTRACTOR shall make all arrangements necessary to provide all temporary utilities for <br /> construction purposes and shall pay all costs associated those temporary utilities. Water for <br /> construction purposes will be furnished by the OWNER at no cost. The CONTRACTOR shall <br /> furnish all valves, hoses, connections and other devices as necessary to obtain sufficient water for <br /> construction and for filling and testing of water lines as required. Fire hydrant use is allowed only <br /> by permission of the utility owner. Backflow protection is required on all connections to potable <br /> water systems. <br /> 1.12 FIELD SERVICE BY MANUFACTURER'S REPRESENTATIVE <br /> The CONTRACTOR shall furnish the services of a manufacturer's or material supplier's <br /> representative for all major equipment and materials furnished by the CONTRACTOR or OWNER <br /> under this contract, to check, place in operation and test the installation, and train operating <br /> ' personnel. The manufacturer's representative shall be qualified and authorized to perform repairs <br /> and maintenance on the equipment. The above gives a general scope of the services desired from <br /> the manufacturer's representative. It will be the responsibility of the CONTRACTOR and the <br /> equipment manufacturer to determine detailed requirements. Costs for services of the <br /> manufacturer's representative shall be included in the proposal of the CONTRACTOR. The <br /> operator training mentioned above shall include sufficient time during the CONTRACTOR's <br /> operation and testing period to fully explain to the operating personnel the features of the <br /> equipment and maintenance thereof. <br /> 1.13 CONSTRUCTION WITHIN PUBLIC RIGHTS-OF-WAY <br /> When the work contemplated is wholly or partly within the right-of-way of a public agency such as <br /> a city, county or state, the OWNER will obtain from these agencies any right-of-way and street <br /> opening permits and all other necessary permit(s) required for the work. The CONTRACTOR shall <br /> abide by all regulations and conditions stipulated in the permit(s). Such conditions and <br /> requirements are hereby made a part of these specifications, as fully and completely as though the <br /> ' same were fully set forth herein. The CONTRACTOR shall examine the permit(s) granted to the <br /> OWNER by any city, county, state and federal agencies. Failure to do so will not relieve the <br /> CONTRACTOR from compliance with the requirements stated therein. <br /> 1.14 CONSTRUCTION WITHIN PRIVATE EASEMENTS <br /> When portions of the work contemplated are within easements held by the OWNER on private <br /> ' Legion Golf Course Stormwater Detention Project Summary of Work <br /> WO#UP3620 01 10 00 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.