My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.17 LIMITS OF THE WORK AND STORAGE OF SPOILS <br /> ' The limits of the site which may be used for construction, storage, materials handling, parking of <br /> vehicles and other operations related to the project include the project site as shown on the <br /> drawings and adjacent public rights-of-way subject to permission of the public owner of that right- <br /> ' of-way. The limits of work also include rights of access obtained by the CONTRACTOR, subject to <br /> all public laws and regulations and rights of access by utility companies and other holders of <br /> easement rights. <br /> 1.18 EXISTING WATER SYSTEM SHUTDOWN <br /> If the project involves the need to shut down an existing water system, the CONTRACTOR shall <br /> coordinate the work to insure a minimum of shutdown time. The CONTRACTOR shall submit a <br /> written shutdown schedule to the ENGINEER for approval. The CONTRACTOR shall provide <br /> notice preceding each shutdown. see Section 01 12 16, Work Sequence, for additional <br /> requirements. <br /> 1.19 FIELD CHANGES,ALIGNMENT AND GRADE <br /> ' Changes of alignment and grade shall be made during the course of work in order to avoid <br /> interference with unforeseen obstructions. The CONTRACTOR shall locate existing utilities to be <br /> ' crossed, by potholing ahead of the pipe installation, of sufficient distance to avoid conflicts through <br /> pipe joint deflection if possible. All costs for minor field changes of alignment and grade shall be <br /> borne by the CONTRACTOR. The ENGINEER will endeavor to make prompt decisions on such <br /> ' matters. CONTRACTOR shall anticipate a minimum of 72 hours for any decision requiring <br /> significant piping change. <br /> 1.20 TESTING AND OPERATION OF FACILITIES <br /> ' It is the intent of the OWNER to have a complete and operable facility. All of the work under this <br /> contract will be fully tested and inspected in accordance with the specifications. Upon completion <br /> ' of the work, the CONTRACTOR shall operate the completed facilities as required to test the <br /> equipment under the direction of the ENGINEER. During this period of operation by the <br /> CONTRACTOR,the new facilities will be tested thoroughly to determine their acceptance. <br /> 1.21 PROTECTION OF EXISTING STRUCTURES AND WORK <br /> The CONTRACTOR must take all precautions and measures necessary to protect all existing <br /> structures and work. Any damage to existing structures and work shall be repaired by removing the <br /> damaged structure or work,replacing the work and restoring to original condition satisfactory to the <br /> ' ENGINEER. <br /> 1.22 SALVAGE AND DEBRIS <br /> ' Unless otherwise indicated on the drawings or in the specifications, all castings, pipe, equipment, <br /> demolition debris, spoil or any other discarded material or equipment shall become the property of <br /> the CONTRACTOR and shall be disposed of in a manner compliant with applicable Federal State <br /> and local laws and regulations governing disposal of such waste products. No burning of debris or <br /> any other discarded material will be permitted. <br /> I <br /> Legion Golf Course Stormwater Detention Project Summary of Work <br /> WO#UP3620 011000-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.