My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ISECTION 01 22 00 - MEASUREMENT AND PAYMENT <br /> PART I GENERAL <br /> I1.1 SUMMARY <br /> A. Measurement and payment will be on a unit price basis in accordance with the prices set <br /> I forth in the proposal for individual work items.Where work is required but does not appear <br /> as a separate item in the proposal,the cost for that work shall be included and absorbed in <br /> the unit prices named in the proposal. CONTRACTOR shall make a careful assessment <br /> I when preparing the bid <br /> B. Section includes: <br /> I 1. Measurement for Lump Sum and Unit Price items <br /> 2. Payment for Lump Sum and Unit Price items <br /> 3. Schedule of Lump Sum and Unit Price <br /> IC. Definitions: <br /> I 1. Unit Price—an amount of compensation to be paid to the Contractor for a specific <br /> unit measurement of material,products,and work. <br /> 2. Lump Sum—the total amount of compensation to be paid to the Contractor for the <br /> described item material,products, and work. <br /> 111 D. Measurement of Quantities <br /> 1 1. Measurement by weight: <br /> a. Weigh on commercial calibrated truck scale per WSDOT Standard Specification <br /> Section 1-09.2. Weigh tickets must include time of weighing on standard printout. <br /> I <br /> b. Notify the Owner's Representative of proposed disposal sites for debris, objects, and <br /> Isoils removed from the construction site. <br /> c. Submit weigh tickets to the Owner's Representative <br /> (11 <br /> 2. Measure by area: <br /> a. Measurement by area shall include the affected area as measured by the Owner's <br /> IRepresentative. <br /> 3. Measure by length: <br /> Ia. Measurement by length will be the number of linear feet of completed installation <br /> measured along the centerline of pipe through fittings,valves and coupling. <br /> Ib. Limits of measurement shall be from the centerline of couplings, valves, fitting, and <br /> manholes. <br /> 1 4. Measurement by volume: <br /> ILegion Golf Course Stormwater Detention Project Measurement and Payment <br /> WO#UP3620 01 22 00- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.