My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 21 13 <br /> SPECIAL PROVISIONS INSTRUCTIONS TO BIDDERS <br /> 3. Certificate of Insurance and additional insured endorsement, DOCUMENT 00 72 13, Part <br /> 15.3 "Insurance", of the Contract Documents. <br /> E. A Contract shall not be formed until the Contract Documents are signed by the Mayor. I <br /> 1.26 TIME OF COMPLETION I <br /> A. The Contractor shall complete the Work on or before the date or dates specified in DOCUMENT <br /> 00 60 13 -CONTRACT. <br /> 1.27 WAGES <br /> A. This Contract is subject to the minimum wage requirements of RCW 39.12 and to RCW 48.28, as <br /> amended or supplemented. Workers shall receive no less than the prevailing rate of wage. Bidder <br /> shall use the Washington State Prevailing Wage Rates for Snohomish County, effective at the <br /> time of bid opening. Bidder is solely responsible to use the schedule in effect at the Bid Opening <br /> Date, determine the appropriate labor classification(s), and use the appropriate and correct <br /> prevailing wage and benefit rate(s). <br /> 1. Current RCW 39.12 prevailing wage rates and fringe benefits can be found on line using <br /> the following URL: <br /> http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp. <br /> a. Washington State Prevailing Wage Rates for Snohomish County, effective at the <br /> time of bid opening are located in the appendix. <br /> b. Printed copies of the current prevailing wage rates are available for viewing at City <br /> of Everett Public Works, 3200 Cedar St,Everett, WA and the City will mail a hard <br /> copy of the prevailing wage rates upon written request received within 7 days of <br /> the Bid Opening Date. <br /> 2. The rules and regulations noted within the Contract Documents are available from: I <br /> State of Washington Department of Labor and Industries City <br /> Employment Standards Division <br /> General Administration Building <br /> Olympia,Washington 98504 <br /> Contact: Janet Day <br /> (206)753-6317 <br /> B. Bidders are advised to examine and to be thoroughly familiar with such requirements. <br /> 1. No claim for additional compensation will be allowed that is based upon a lack of <br /> knowledge of these requirements or a failure to include adequate increases in such wages <br /> over the term of this Contract in the Bidder's bid price. <br /> 1.28 EQUAL EMPLOYMENT OPPORTUNITY <br /> A. The Contractor will be required to assure that equal employment opportunities will be in effect to <br /> all individuals throughout the length of this Contract, pursuant to DOCUMENT 00 72 13-, Part 7 <br /> "Labor Standards,"of the Contract Documents. I <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 21 13 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.