Laserfiche WebLink
I <br /> SECTION 01 33 00-SUBMITTAL PROCEDURES <br /> PART 1 GENERAL <br /> 1.1 SUMMARY <br /> A. This Section expands administrative and procedural requirements for submittals for review, <br /> information,and for Project closeout. <br /> B. Section includes: <br /> 1. Contractor review. <br /> 2. Engineer review. <br /> 3. Submittal procedures. <br /> 4. Product data. <br /> 5. Shop Drawings. <br /> 6. Samples. <br /> 7. Design data. <br /> 8. Test reports. <br /> 9. Certificates. <br /> 10. Manufacturer's instructions. <br /> 11. Manufacturer's field reports. <br /> 12. Erection Drawings. <br /> 13. Construction progress schedules. <br /> 14. Breakdown of contract price. <br /> 15. Proposed product list. <br /> 16. Public Health& Safety Plan. <br /> 1 17. Close out submittals. <br /> 1.2 DEFINITIONS <br /> A. Action Submittals: Written and graphic information and physical samples that require <br /> Architect/Engineer's responsive action. <br /> • <br /> B. Informational Submittals: Written and graphic information and physical Samples that do not <br /> require Architect/Engineer's responsive action. Submittals may be rejected for not complying <br /> with requirements. <br /> 1.3 CONTRACTOR REVIEW <br /> A. Review for compliance with Contract Documents and approve submittals before transmitting <br /> to Engineer. <br /> ' B. Contractor: Responsible for: <br /> 1. Determination and verification of materials including manufacturer's catalog numbers. <br /> 2. Determination and verification of field measurements and field construction criteria. <br /> I <br /> Legion Golf Course Stormwater Detention Project Submittal Procedures <br /> WO#UP3620 01 33 00 - 1 <br />