My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> SECTION 01 33 00-SUBMITTAL PROCEDURES <br /> PART 1 GENERAL <br /> 1.1 SUMMARY <br /> A. This Section expands administrative and procedural requirements for submittals for review, <br /> information,and for Project closeout. <br /> B. Section includes: <br /> 1. Contractor review. <br /> 2. Engineer review. <br /> 3. Submittal procedures. <br /> 4. Product data. <br /> 5. Shop Drawings. <br /> 6. Samples. <br /> 7. Design data. <br /> 8. Test reports. <br /> 9. Certificates. <br /> 10. Manufacturer's instructions. <br /> 11. Manufacturer's field reports. <br /> 12. Erection Drawings. <br /> 13. Construction progress schedules. <br /> 14. Breakdown of contract price. <br /> 15. Proposed product list. <br /> 16. Public Health& Safety Plan. <br /> 1 17. Close out submittals. <br /> 1.2 DEFINITIONS <br /> A. Action Submittals: Written and graphic information and physical samples that require <br /> Architect/Engineer's responsive action. <br /> • <br /> B. Informational Submittals: Written and graphic information and physical Samples that do not <br /> require Architect/Engineer's responsive action. Submittals may be rejected for not complying <br /> with requirements. <br /> 1.3 CONTRACTOR REVIEW <br /> A. Review for compliance with Contract Documents and approve submittals before transmitting <br /> to Engineer. <br /> ' B. Contractor: Responsible for: <br /> 1. Determination and verification of materials including manufacturer's catalog numbers. <br /> 2. Determination and verification of field measurements and field construction criteria. <br /> I <br /> Legion Golf Course Stormwater Detention Project Submittal Procedures <br /> WO#UP3620 01 33 00 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.