My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 21 13 <br /> SPECIAL PROVISIONS INSTRUCTIONS TO BIDDERS <br /> 1. Bid: Show the lump sum and unit price items in the space provided on the Bid Form. I <br /> 2. Bid Signature Sheet: To be filled in and signed by the Bidder. <br /> 3. Subcontractors Form: To be filled in by the Bidder. I <br /> 4. Bid Security: This form is to be executed by the Bidder and the surety company unless <br /> Bid is accompanied by a certified or cashiers check. The amount of the bond or cashiers <br /> check, which shall be not less than five percent of the Total Bid Amount bid, may be <br /> shown in dollars or on a percentage basis. <br /> 5. Disadvantaged/Women's Business Enterprise: To be filled in and signed by the <br /> Bidder. <br /> 6. Non-Collusion Affidavit: To be signed, notarized and submitted with the Bid. <br /> 7. Addenda: Signed copies of all addenda must be submitted with the Bid. I <br /> B. Failure to complete and fully execute the aforementioned forms and to submit them with the Bid <br /> may result in rejection of Bid. I <br /> C. Prior to award, the lowest responsive and responsible bidder must sign and submit DOCUMENT <br /> 00 45 46 - CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES <br /> included in with the bid forms. This certification is NOT required to be submitted with the <br /> bid proposal and may be submitted after bid opening. <br /> D. The following forms are to be executed after the award of Contract: I <br /> 1. Contract: This Contract to be executed by the successful Bidder in duplicate within 14 <br /> calendar days after the award date. <br /> 2. Payment and Performance Bond: This form is to be executed by the successful Bidder <br /> and his surety company in triplicate. The amount of these bonds shall be 100 percent of <br /> the Total Bid Amount and shall be submitted with the Contract. I <br /> 3. Proof of Insurance: Insurance certificates and endorsements shall be obtained and <br /> maintained in force in accordance with DOCUMENT 00 72 13, Part 15 "Liability and <br /> Insurance", of the Contract Documents. 4 <br /> 4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds must file <br /> with each bond a certified and effectively dated copy of their Power of Attorney. <br /> 5. Statement of Intent to Pay Prevailing Wage(L&I Form F700-029-000) and Affidavit <br /> of Wages Paid (F700-007-000) from the Contractor, Subcontractor and agents to the <br /> Subcontractor shall be submitted to the Employment Standards Division, State <br /> Department of Labor and Industries, Olympia, Washington. If the prime contract is over <br /> $1,000,000, then Contractor also needs to submit L&I Form F700-164-000 (Affidavit of <br /> Wages Paid El B 2805 Addendum). <br /> 6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form <br /> WH347): Contractors, Subcontractors, and agents to Subcontractors using Payroll Form <br /> WH347) may use State of Compliance found on back of form. <br /> I <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 21 13 - 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.