Laserfiche WebLink
I <br /> concretelacin for the installation wind breaks or shading, and for fog spraying, wet <br /> P g <br /> sprinkling or moisture-retaining covering. Protect the concrete continuously for the <br /> concrete curing period. Provide hot weather protections complying with the requirements <br /> of ACI 305. <br /> 1 3. Maintain concrete temperature as uniformly as possible and protect from rapid atmospheric <br /> temperature changes. Avoid temperature changes in concrete, which exceed 5°F in any <br /> one-hour and 50°F in any 24-hour period. <br /> END OF SECTION <br /> I <br /> t <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Legion Golf Course Stormwater Detention Project Concrete Work <br /> WO#UP3620 03 11 00- 9 <br />