My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1. ANSIBHMA A156.20-American National Standard for Strap and Tee Hinges and Hasps. <br /> G. SSPC: The Society for Protective Coatings: I <br /> 1. SSPC - Steel Structures Painting Manual. <br /> 2. SSPC Paint 15 - Steel Joist Shop Primer/Metal Building Primer. <br /> 3. SSPC Paint 20-Zinc-Rich Coating(Type I-Inorganic and Type II-Organic). <br /> 4. SSPC SP 1 - Solvent Cleaning. <br /> 5. SSPC SP-7 Brush-off Blast Cleaning. <br /> 6. SSPC SP 10-Near-White Blast Cleaning. <br /> 1.3 SUBMITTALS <br /> A. Section 01 33 00- Submittal Procedures: Requirements for submittals. <br /> B. Manufacturer's Data: For information only, submit copies of manufacturer's specifications, <br /> load tables,dimension diagrams, anchor details and installation instructions for products to be <br /> used in miscellaneous metal work, including paint products. <br /> C. Shop Drawings: <br /> 1. General: Submit copies of shop drawings for the fabrication and erection of all assemblies <br /> of miscellaneous metal work which are not completely shown by the manufacturer's data �. <br /> sheets. <br /> a. Include plans, elevations and details of sections and connections and fabricators I <br /> proposed shop coat paint or galvanizing specifications. <br /> b. Show anchorage and accessory items. I <br /> c. Furnish setting drawings, diagrams, templates, instructions, and directions for <br /> installation of anchorages, such as concrete inserts, anchor bolts, and miscellaneous <br /> items having integral anchors,which are to be embedded in concrete construction. <br /> d. Indicate welded connections using standard AWS A2.4 welding symbols. <br /> e. Indicate net weld lengths. <br /> D. Samples: I <br /> 1. Submit two sets of representative samples of materials,illustrating factory finishes as may <br /> be requested by the Engineer. <br /> 2. Engineer's review will be for color,texture, style and finish only. <br /> E. Welders Certificates: Certify welders employed on the Work, verifying AWS qualification I <br /> within previous 12 months. <br /> F. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and <br /> inspections. <br /> I. <br /> Legion Golf Course Stormwater Detention Project Metal Fabrications <br /> WO#UP3620 05 50 00 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.