My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. When tests indicate materials do not meet specified requirements, change material or vary <br /> compaction methods and retest. Additional testing shall be completed and paid for by the <br /> ' Contractor with no reimbursement by the Owner. <br /> C. Furnish materials of each type from same source throughout the Work. <br /> PART 3 EXECUTION <br /> 3.1 EXCAVATION <br /> A. Excavate material of every nature and description to the lines and grades as indicated on the <br /> Drawings and/or as required for construction of facilities. <br /> B. Site within clearing limits shall be stripped of topsoil as required to obtain additional topsoil <br /> ' necessary to complete Work indicated in the Drawings or as specified. <br /> C. When practical, do not excavate wet top soil. <br /> ' D. Stockpile excavated material meeting requirements for subsoil materials and topsoil <br /> materials. <br /> ' E. Remove excess excavated subsoil and topsoil not intended for reuse from Site. <br /> F. Remove excavated materials not meeting requirements for subsoil materials and topsoil <br /> materials from Site. <br /> 3.2 STOCKPILING <br /> ' A. Stockpile soils at locations shown in the Drawings or at locations as approved by Engineer <br /> for redistribution as specified. <br /> 1. Site may not have sufficient area to stockpile excavated material that will be required for <br /> fill later in the project. If additional stockpile area is required to complete the Project on <br /> schedule, arrange off-site stockpile areas. <br /> ' 2. No additional payments will be made for stockpiling excavated materials off-site. <br /> ' B. Stockpile in sufficient quantities to meet Project schedule and requirements. <br /> C. Separate differing materials with dividers or stockpile apart to prevent mixing. <br /> D. Prevent intermixing of soil types or contamination. <br /> E. Direct surface water away from stockpile site to prevent erosion or deterioration of materials. <br /> 1. Grade surface of stockpiles to prevent ponding of water. <br /> 2. Cover stockpiles to minimize the infiltration of water. <br /> ' F. Stockpile unsuitable and/or hazardous materials on impervious material and cover to prevent <br /> erosion and leaching,until disposed of. <br /> Legion Golf Course Stormwater Detention Project Soils for Earthwork <br /> WO#UP3620 31 05 13 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.