Laserfiche WebLink
1 <br /> PART 3 EXECUTION <br /> 3.1 STOCKPILING <br /> A. Stockpile materials imported to site at shown in the Drawings or at locations as approved by <br /> 1 Engineer for redistribution as specified. <br /> B. Separate different aggregate materials with dividers or stockpile individually to prevent <br /> ' mixing. <br /> C. Prevent intermixing of aggregate types or contamination. <br /> D. Direct surface water away from stockpile site to prevent erosion or deterioration of materials. <br /> 1. Grade surface of stockpiles to prevent ponding of water. <br /> 1 2. Cover stockpiles to minimize the infiltration of water. <br /> 3.2 STOCKPILE CLEANUP <br /> 1 A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent free <br /> standing surface water. <br /> B. When borrow area is indicated, leave area in clean and neat condition. Grade site surface to <br /> prevent free standing surface water. <br /> 1 <br /> END OF SECTION <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> 1 Legion Golf Course Stormwater Detention Project Aggregates for Earthwork <br /> WO#UP3620 31 05 16 -5 <br />