My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> PART 3 EXECUTION <br /> 3.1 STOCKPILING <br /> A. Stockpile materials imported to site at shown in the Drawings or at locations as approved by <br /> 1 Engineer for redistribution as specified. <br /> B. Separate different aggregate materials with dividers or stockpile individually to prevent <br /> ' mixing. <br /> C. Prevent intermixing of aggregate types or contamination. <br /> D. Direct surface water away from stockpile site to prevent erosion or deterioration of materials. <br /> 1. Grade surface of stockpiles to prevent ponding of water. <br /> 1 2. Cover stockpiles to minimize the infiltration of water. <br /> 3.2 STOCKPILE CLEANUP <br /> 1 A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent free <br /> standing surface water. <br /> B. When borrow area is indicated, leave area in clean and neat condition. Grade site surface to <br /> prevent free standing surface water. <br /> 1 <br /> END OF SECTION <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> 1 Legion Golf Course Stormwater Detention Project Aggregates for Earthwork <br /> WO#UP3620 31 05 16 -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.