My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> SECTION 31 23 16-EXCAVATION <br /> IPART 1 GENERAL <br /> 1.1 SUMMARY <br /> IA.This Section includes excavation required for building foundations, site structures,or under slabs- <br /> I on-grade or paving. Excavating for utilities outside building is included in Section 31 23 17, <br /> Trenching. B. Section Includes: <br /> I 1. Excavating for building foundations. <br /> 2. Excavating for paving,roads, and parking areas. <br /> I 3. Excavating for slabs-on-grade. <br /> 4. Excavating for site structures. <br /> 5. Excavating for landscaping. <br /> I1.2 DEFINITIONS <br /> I A. Common Excavation: All excavation required for Work, regardless of the type, character, <br /> composition or condition of the material encountered. Common Excavation <br /> 4 shall further include all debris, junk, broken concrete, and all other material. All excavation <br /> shall be classified as Common Excavation, unless provided as Rock for under Section 31 23 <br /> 18, Rock Removal below. <br /> Material: All soils, aggregate, broken concrete,Commondebris, junk, and miscellaneous <br /> I material encountered in Common Excavation, excluding rock as defined below. <br /> 1 <br /> C. Concrete Excavation: The removal of pieces of concrete larger than 1 cubic yard in vo ume <br /> that requires drilling,splitting and breaking methods,or a necessitating a trench width increase <br /> Iof 18 inches or more than the width of the preceding 10 feet of trench. Concrete excavation <br /> includes materials composed of Portland cement that are not identified other than manholes, <br /> Istructures, sewer pipe, or other appurtenances. <br /> D. Exploratory Excavation: The removal and replacement of material from locations shown on <br /> the Drawings, or as directed for the purpose of investigating underground conditions and <br /> identifying potential utility conflict between existing and proposed utilities. <br /> I E. Overbreak: Material beyond and outside of the slope limits established by the Owner's <br /> Representative,which becomes displaced or loosened during excavation and is excavated. <br /> F. Pothole Excavation: Pothole excavation is the removal and replacement of all materials via <br /> coring, vacuum extraction, or similar method, not classified as exploratory excavation, for the <br /> purposes of locating an underground utility and to investigate underground conditions. <br /> I <br /> ILegion Golf Course Stormwater Detention Project Excavation <br /> WO#UP3620 31 23 16 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.