Laserfiche WebLink
I <br /> C. Clean up and remove all excess materials,construction materials,debris from construction, <br /> etc. Replace or repair any fences, mailboxes, signs, landscaping, or other facilities removed <br /> or damaged during construction. Replace all lawns,topsoil, shrubbery, flowers,etc., <br /> damaged or removed during construction. The Contractor shall be responsible for seeing that <br /> lawns, shrubs, etc. remain alive and leave premises in condition equal to original condition <br /> before construction. <br /> 3.17 SCHEDULE <br /> Not used. I <br /> END OF SECTION <br /> 1 <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> p <br /> I <br /> 1 <br /> Legion Golf Course Stormwater Detention Project Trenching <br /> WO#UP3620 31 23 17-22 <br />