My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 10. ASTM D4832 - Standard Test Method for Preparation and Testing of Controlled Low <br /> Strength Material (CLSM) Test Cylinders. <br /> 1.4 SUBMITTALS <br /> A. Section 01 33 00- Submittal Procedures: Requirements for submittals. I <br /> B. Manufacturer's Certificate: Certify that products meet or exceed specified requirements. <br /> C. Field Quality-Control Submittals: 1 <br /> 1. Mix Design: <br /> a. Furnish flowable fill mix design for each specified strength. <br /> b. Furnish separate mix designs when admixtures are required for the following: I <br /> 1) Flowable fill Work during hot and cold weather. <br /> 2) Air entrained flowable fill Work. <br /> c. Identify design mix ingredients,proportions,properties, admixtures, and tests. <br /> 2. Furnish test results to certify flowable fill mix design properties meet or exceed specified , <br /> requirements. <br /> D. Delivery Tickets: I <br /> 1. Furnish duplicate delivery tickets indicating actual materials delivered to Project Site. <br /> 1.5 QUALITY ASSURANCE I <br /> A. In-place testing of Flowable Fill: In accordance with ASTM C403. <br /> B. Compressive testing of Flowable Fill: In accordance with ASTM D4832. <br /> 1.6 ENVIRONMENTAL REQUIREMENTS I <br /> A. Minimum Conditions: The following minimum conditions shall be met at time of flowable <br /> fill placement. I <br /> 1. Do not install flowable fill during inclement weather. <br /> 2. Ambient temperature must be at least 34 degrees F (4 degrees C) and rising. 1 <br /> 3. Flowable fill shall be at 40 degrees F (4 degrees C). <br /> 4. Subgrade on which flowable fill is to be placed shall be free of disturbed or soft material, <br /> debris and water. <br /> I <br /> I <br /> Legion Golf Course Stormwater Detention Project Flowable Fill <br /> WO#UP3620 31 23 24 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.