My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS 00 41 13 <br /> I <br /> SPECIAL PROVISIONS BID FORM-STIPULATED SUM <br /> (SINGLE-PRIME CONTRACT) <br /> I <br /> ITEM NO. DESCRIPTION UNIT EST.QTY UNIT PRICE CONTRACT PRICE <br /> PIPE END <br /> I <br /> 29 PROTECTION LS 1 $7,SU 0 .00 $ 11 cp o.cid <br /> PLASTIC <br /> REINFORCED TURF <br /> 30 PAVING SF 2,868 $ Cj.d C� $ it M,0 <br /> .UU <br /> I <br /> STABILIZED <br /> 31 ACCESS ROAD TON 30 $ •0 0 $ i , j9) 'CO <br /> PROPERTY I <br /> 32 RESTORATION LS 1 $ \gi0o0.C.) $ [64oOO ,cA <br /> ELECTRICAL <br /> 33 SERVICE&SUPPLY LS 1 $ 35,000.u) $ 2✓S,0 0 0 ,c)o <br /> GOLF IMPROVEMENTS I <br /> SPRAY HERBICIDE <br /> AND <br /> 34 TILLING TOPSOIL AC15.95 0(506.00 $ 71 X115 .O d I <br /> TOPSOIL <br /> STRIPPING/HAULIN <br /> I <br /> 35 G CY 7,720 $ c6.00 $ (II r l(Q0 ,U0 <br /> 36 CLEARING LS 1 0(000,00 $ 1,0/00 d . " <br /> CART PATH i <br /> 37 REMOVAL LS 1 $ 11,Sa a•UU $ I-7/5-60‘ °° <br /> 38 SHAPING LS 1 02/5-1)0.0 $ 1-Z 100.00 <br /> , <br /> GOLF COURSE <br /> CATCH BASIN, 8- <br /> 39 INCH EA 9 $ 550,00 $ 4 ,1 ,00 <br /> GOLF COURSE <br /> CATCH BASIN, 10- 31 $ `�/3-1;' Y U <br /> 40 INCH EA $ (01-C.U 0 <br /> GOLF COURSEI <br /> CATCH BASIN, 12- <br /> 41 INCH EA 2 $ is-UO $ �olo ,U) <br /> GOLF COURSE <br /> I <br /> DRAIN PIPE,4- <br /> 42 PERFORATED HDPE LF CH, 8,515 $ IZ .0 0 $ I a 2, 1 W.00 <br /> GOLF COURSE I <br /> DRAIN PIPE,6- <br /> INCH, 3,675 <br /> 43 PERFORA1EDHDPE LF $ \"9,0U $ 5S, I2S,C <br /> I <br /> GOLF COURSE <br /> DRAIN PIPE,4- <br /> INCH, SOLID WALL 3,670 $ 4u 37O Ui) 1 <br /> 44 HDPE LF $ \\ <br /> l ,aU <br /> Legion Golf Course Stormwater Detention Project December 28,2017 I <br /> WO#UP3620 00 41 13 -4 <br /> I18 <br /> ided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scala <br />
The URL can be used to link to this page
Your browser does not support the video tag.