Laserfiche WebLink
"4. After tilling is complete, the total topsoil to be removed equals approximately 11,834 <br /> CY. Of the 11,834 CY of generated topsoil material, approximately 7,868 CY of <br /> stripped topsoil will be stockpiled and replaced and the difference of 11,834 CY minus <br /> 7,868 CY, totaling 3,966 CY will be replaced with approved plating sand (as identified <br /> on plans as Through-the-Green). <br /> The extra 3,966 CY of stripped stockpile is to be used in shaping the golf course <br /> features. NOTE: it is the Contractor's responsibility to save enough topsoil material to <br /> replace all disturbed areas with 6" of stripped topsoil and sand plating." <br /> All other requirements of the contract documents remain in effect. <br /> City of Everett <br /> Attachments: <br /> Section 00 41 13, Bid Form - Stipulated Sum, December 28, 2017 <br /> wA <br /> v' <br /> it, ` 97 <br /> DA D <br /> IS TERM { j 1 <br /> 'ZONAL layG1.��' <br /> 2-1 n f0 !/" <br /> Page 14 of 14 <br />