My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"4. After tilling is complete, the total topsoil to be removed equals approximately 11,834 <br /> CY. Of the 11,834 CY of generated topsoil material, approximately 7,868 CY of <br /> stripped topsoil will be stockpiled and replaced and the difference of 11,834 CY minus <br /> 7,868 CY, totaling 3,966 CY will be replaced with approved plating sand (as identified <br /> on plans as Through-the-Green). <br /> The extra 3,966 CY of stripped stockpile is to be used in shaping the golf course <br /> features. NOTE: it is the Contractor's responsibility to save enough topsoil material to <br /> replace all disturbed areas with 6" of stripped topsoil and sand plating." <br /> All other requirements of the contract documents remain in effect. <br /> City of Everett <br /> Attachments: <br /> Section 00 41 13, Bid Form - Stipulated Sum, December 28, 2017 <br /> wA <br /> v' <br /> it, ` 97 <br /> DA D <br /> IS TERM { j 1 <br /> 'ZONAL layG1.��' <br /> 2-1 n f0 !/" <br /> Page 14 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.