My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS 00 41 13 <br /> SPECIAL PROVISIONS BID FORM- STIPULATED SUM <br /> (SINGLE-PRIME CONTRACT) <br /> ITEM NO. DESCRIPTION UNIT EST.QTY UNIT PRICE CONTRACT PRICE <br /> STORM SEWER <br /> PIPE,24-INCH <br /> DIAMETER, 955 <br /> 17 POLYETHYLENE LF $ $ <br /> STORM SEWER <br /> PIPE, 18-INCH <br /> DIAMETER, CLASS 68 <br /> 18 IV REINF. CONC. LF $ $ <br /> STORM SEWER <br /> PIPE,24-INCH <br /> DIAMETER, CLASS 315 <br /> 19 IV REINF. CONC. LF $ $ <br /> STORM SEWER <br /> PIPE, 30-INCH <br /> DIAMETER, CLASS 185 <br /> 20 III REINF. CONC. LF $ $ <br /> POND <br /> EXCAVATION AND <br /> EARTHWORK, <br /> NORTH 1 <br /> DETENTION POND <br /> 21 (EXISTING) LS $ $ <br /> POND <br /> EXCAVATION AND <br /> EARTHWORK, 1 <br /> SOUTH DETENTION <br /> 22 POND LS $ $ <br /> CONTROL <br /> STRUCTURE <br /> SYSTEM,NORTH 1 <br /> 23 DETENTION POND LS $ $ <br /> CONTROL <br /> STRUCTURE <br /> SYSTEM, SOUTH 1 <br /> 24 DETENTION POND LS $ $ <br /> POND LINER <br /> SYSTEM,NORTH <br /> 1 <br /> 25 DETENTION POND LS $ $ <br /> POND LINER <br /> SYSTEM, SOUTH <br /> 1 <br /> 26 DETENTION POND LS $ $ <br /> 27 AERATION SYSTEM LS 1 $ $ <br /> SEGMENTAL <br /> 28 RETAINING WALL SF 8,152 $ $ <br /> Legion Golf Course Stormwater Detention Project December 28, 2017 <br /> WO#UP3620 00 41 13 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.