My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIP%,• <br /> EVERETT <br /> CITY OF EVERETT, WASHINGTON <br /> PUBLIC WORKS <br /> UTILITIES <br /> ADDENDUM NO. 2 <br /> LEGION GOLF COURSE STORMWATER DETENTION PROJECT <br /> W.O. #UP 3620 <br /> DATE OF ISSUANCE: January 8, 2018 <br /> BID OPENING DATE AND TIME PER NOTICE TO CONTRACTORS — 2:00 PM JANUARY <br /> 9, 2018, AT THE CITY CLERK'S OFFICE, 2930 WETMORE AVENUE. <br /> Notice to Plan Holders: <br /> This Addendum No. 2 contains 1 page and contains revisions, additions, deletions, and/or <br /> clarifications and is hereby made a part of the contract documents for the above named <br /> project and shall be considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 2 in the space provided in the Bid <br /> Proposal. Failure to do so render the Bid non-responsive and may cause its rejection. <br /> THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: <br /> VOLUME I — SPECIFICATIONS <br /> 1. Division 00, Section 00 41 13, Bid Form— Stipulated Sum <br /> Part 1.2, in the first sentence in the Note following the Bid Form, delete "...Section 1-07.2(2) <br /> Sales Tax— Rule 171 of the Special Provisions..." and replace with "...Section 1-07.2(1) <br /> Sales Tax — Rule 171 of the Special Provisions..." <br /> All other requirements of the contract documents AME <br /> remain in effect. �'�oP wAs.," <br /> � <br /> City of Everett " Zgt7 yp ) , 1° <br /> fr"B <br /> A� 39797 �¢ <br /> &GzszsRR9 <br /> �BSSIONAL�G1�� <br /> 1`J <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.