Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS 00 41 13 ' <br /> SPECIAL PROVISIONS BID FORM-STIPULATED SUM <br /> (SINGLE-PRIME CONTRACT) <br /> Note: This project is associated with storm water and combined sewer system work and Section <br /> 1-07.2(2) Sales Tax—Rule 171 of the Special Provisions is applicable for the payment of sales <br /> tax.The Contractor shall include Washington State Retail Sales Tax in the various bid item pric- <br /> es,including those that the Contractor pays on the purchase of materials, equipment, or supplies <br /> used or consumed in doing work. <br /> 1.3 ACCEPTANCE <br /> A. This offer shall be open to acceptance and is irrevocable for 45 days from the Bid closing date. <br /> B. If this Bid is accepted by the Owner within the time period stated above,we will: <br /> 1. Execute the Agreement within 7 days of receipt of Notice of Award. <br /> 2. Furnish the required 100%payment and 100%performance bonds within 7 calendar days <br /> of receipt of Notice of Award in the form described in Supplementary Conditions. ' <br /> 3. Commence Work within seven calendar days after receipt of Notice to Proceed. <br /> C. If this Bid is accepted within the indicated time,and we fail to commence the Work or we fail to <br /> provide the required bonds, the Bid security shall be forfeited as damages to the Owner by <br /> reason of our failure, limited in amount to the lesser of the face value of the Bid security or the <br /> difference between this Bid and the Bid upon which Contract is signed. ' <br /> D. In the event our Bid is not accepted within the time stated above, the required Bid security will <br /> be returned to the undersigned,according to the provisions of the Instructions to Bidders, unless <br /> a mutually satisfactory arrangement is made for its retention and validity for an extended period <br /> of time. <br /> 1.4 CONTRACT TIME <br /> A. If this Bid is accepted, we will: <br /> 1. Begin work immediately after receiving Owner's letter of Notice to Proceed and to reach <br /> Substantial Completion within the dates required under the Contract Documents. <br /> 2. Agree to pay liquidated damages to the City as stated in the Contract (DOCUMENT 00 <br /> 60 13)in the event the project is not completed on or before required time periods. <br /> 3. Contract with the Owner using the Contract form provided herewith, on the terms and <br /> conditions contained herein, to do everything necessary for to complete the construction , <br /> of the project within the allotted time. <br /> 1.5 ADDENDA 1 <br /> A. Following Addenda have been received, and the modifications to the Bid Documents noted <br /> below have been considered and all costs are included in the Bid Sum. <br /> 1. Addendum No I ,dated .1 ,1..6I 7 <br /> Legion Golf Course Stormwater Detention Project December 28, 2017 <br /> WO#UP3620 00 41 13 -6 <br /> 20 <br /> ded to Builders Exchange of WA, Inc. For usage Conditions Aareement SPP v,,w,hv\n,a r�rr,_ ve.;f,. <br />