Laserfiche WebLink
I <br /> DIVISION 33—UTILITIES I <br /> 33 01 30.13 SEWER AND MANHOLE TESTING <br /> 33 05 13 MANHOLES I <br /> 33 11 10 WATER UTILITY DISTRIBUTION PIPING <br /> 33 11 50 EXISTING PIPE ABANDONMENT <br /> 33 13 00 TESTING AND DISINFECTING OF WATER UTILITY PIPING I <br /> 33 31 10 SANITARY UTILITY SEWERAGE PIPING <br /> 33 41 10 STORM UTILITY DRAINAGE PIPING <br /> 33 49 10 GEOMEMBRANE LINER <br /> DIVISION 40—PROCESS INTEGRATION <br /> 40 05 23.15 GATE VALVES <br /> 40 05 23.72 MISCELLANEOUS VALVES <br /> APPENDICES <br /> APPENDIX A ASBUILT AND RECORD DRAWINGS OF LEGION <br /> MEMORIAL GOLF COURSE <br /> APPENDIX B GEOTECHNICAL REPORT <br /> APPENDIX C CITY OF EVERETT STANDARD DRAWINGS <br /> APPENDIX D PREVAILING WAGES <br /> VOLUME 3 OF 3 <br /> CONTRACT DRAWINGS <br /> CONTRACT DRAWINGS I <br /> GENERAL SHEETS— STORMWATER <br /> SURVEY& CONTROL SHEETS <br /> DEMOLITION & SITE PREPARATION SHEETS <br /> CIVIL SHEETS <br /> ELECTRICAL & ILLUMINATION SHEETS <br /> GENERAL SHEETS —GOLF <br /> GOLF COURSE FEATURES SHEETS <br /> GOLF COURSE IRRIGATION SHEETS <br /> GOLF COURSE PLANTING SHEETS <br /> GOLF COURSE DETAILS SHEETS <br /> I <br /> I <br /> I <br /> I <br /> Legion Golf Course Stormwater Detention Project November 30, 2017 <br /> WO#UP3620 <br /> Table of Contents Page TOC-iv <br />