Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS 00 60 13 <br /> SPECIAL PROVISIONS CONTRACT <br /> 1 DOCUMENT 00 60 13 —CONTRACT <br /> 1.1 GENERAL <br /> Cn <br /> A. THIS CONTRACT is made and entered into this a� day of 3A0J R' , 201'by and <br /> between the City of Everett, Washington, a municipal corporation existing under the laws of the <br /> State of Washington, hereinafter called the "City," and <br /> RQ O$W1 COOS-MO CI tO , It-1C, a <br /> oc - ,. , hereinafter called the"Contractor." <br /> B. In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees <br /> to furnish all labor,tools,materials, equipment, and supplies required to build and construct and <br /> to build and construct in a workmanlike manner the Work, improvements, and appurtenances in <br /> accordance with the Specifications and Drawings entitled: "LEGION GOLF COURSE <br /> STORMWATER DETENTION". <br /> I <br /> 1.2 DEFINITIONS <br /> ' A. Contract Documents. The following documents ("Contract Documents") are incorporated by <br /> reference and are hereby made a part of this Contract: <br /> 111 1. Notice to Bidders <br /> 2. Instructions to Bidders <br /> 3. General Conditions <br /> 4. Supplementary Conditions(if any) <br /> 5. Drawings, Standard Plans, and Specifications <br /> 6. Addenda(if any) <br /> 7. Payment and Performance Bond <br /> I 8. Contractor's Bid Form <br /> 9. Other documents described as Contract Documents in Section 07 20 00, General <br /> Conditions <br /> 10. All provisions required by law whether set forth and reproduced herein or not. <br /> B. Terms that are capitalized in a Contract Document but not defined in that Contract Document <br /> shall have the meaning defined to them in the other Contract Documents. <br /> C. Contract Time. <br /> 1. Substantial Completion of the Work shall be achieved within 110 working days after the <br /> effective date of the Notice to Proceed. <br /> 2. Physical Completion shall be within 145 working days after the actual date of issuance <br /> of substantial completion. <br /> D. Liquidated Damages. <br /> 1. The parties agree the City will suffer damage and be put to additional expense in the <br /> event that the Contractor does not complete the Work in all respects and have it ready for <br /> use by the Substantial and Physical Completion dates stated above and as adjusted for <br /> weather related delays. <br /> r <br /> Legion Golf Course Stormwater Detention Project November 30, 2017 <br /> WO#UP3620 00 60 13 - 1 <br />