My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> CITY OF EVERETT PUBLIC WORKS 00 60 13 <br /> SPECIAL PROVISIONS CONTRACT <br /> including, but not limited to such claims as may arise out of or result from the <br /> Contractor's operations under the Contract, whether such operations be by itself, any <br /> subcontractor or supplier, by anyone directly or indirectly employed by any of them, or <br /> by anyone for whose acts any of them may be liable. <br /> 2. If not specified elsewhere in the Contract, such insurance shall provide coverage at no <br /> less than$2,000,000. <br /> 3. The Contractor's policies shall endorse the City, including its officers, employees, agents <br /> and representatives, as additional insureds. <br /> 4. The Contractor shall comply with the insurance requirements set forth in the Contract <br /> Documents. <br /> 5. Failure to maintain such insurance shall be a material breach of the Contract. <br /> 6. City shall be entitled to damages for such a breach that include,but are not limited to, any <br /> loss (including, but not limited to, third party litigation expenses and professional fees) <br /> suffered by the City if the City is determined to be solely or concurrently negligent, and if <br /> the City suffers any loss or must pay or defend against any such claim, suit, demand or <br /> damage as a result of such breach. <br /> K. Waiver of Industrial Insurance Immunity. <br /> 1. Contractor waives any right of contribution against the City. <br /> 2. It is agreed and mutually negotiated that in any and all claims against the City, its agents <br /> or employees, the Contractor, a subcontractor, anyone directly or indirectly employed by <br /> the Contractor or subcontractor, or anyone for whose acts any of them may be liable, the <br /> defense and indemnification obligations hereunder shall not be limited in any way by any <br /> limitation on the amount of damages, compensation, or benefits payable by or for the <br /> Contractor or any subcontractor under industrial worker's compensation acts, disability <br /> benefit acts, or other employees' benefit acts. <br /> 3. Contractor's and City's signatures hereto indicate specific waiver of Contractor's <br /> industrial insurance immunity in order to fulfill this indemnity. <br /> 4. Solely for the purpose of indemnification and defense as provided in this Contract, the <br /> Contractor specifically waives any immunity under the State Industrial Insurance Law, <br /> Title 51 RCW. <br /> 5. The Contractor expressly acknowledges that this waiver of immunity under Title 51 <br /> RCW was the subject of mutual negotiation and was specifically entered into pursuant to <br /> the provisions of RCW 4.24.115. <br /> L. Repair of Damage. 111 <br /> 1. The Contractor agrees to repair and replace all property of the City and all property of <br /> others damaged by it, its employees, subcontractors, suppliers and agents. <br /> M. Pre-Bid Inspection and Risk of Loss. <br /> 1. It is understood that the whole of the work under this contract is to be done at the <br /> Contractor's risk and that: <br /> a. prior to submitting its it became familiar with the conditions of excavation, <br /> subsurface, backfill, materials, climatic conditions, location, traffic, and other <br /> contingencies that may affect the work and has made its bid accordingly and <br /> b. that it assumes the responsibility and risk of all loss or damage to materials or <br /> work that may arise from any cause whatsoever prior to completion. <br /> N. Headings for Convenience Only. • <br /> 1. The headings in this document are for convenience only, and shall not used or considered <br /> to interpret or construe this document. 1 <br /> Legion Golf Course Stormwater Detention Project November 30, 2017 <br /> WO#UP3620 00 60 13 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.