My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 63 65 <br /> SPECIAL PROVISIONS CHANGE ORDER-UNILATERAL <br /> As allowed by the contract, the City directs the Contractor as follows: <br /> I. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. The contract sum shall be adjusted as described in this Change Order. I <br /> 3. The duration of the Contract, and contractually scheduled completion date, shall be <br /> adjusted to the extent described in this Change Order. <br /> 4. Unless the Contractor timely and properly follows the procedures in the contract for <br /> seeking further equitable adjustment of time and compensation, including, but not <br /> limited to, delays, impacts, inefficiencies, overhead, and direct and indirect costs, and <br /> except as otherwise expressly provided herein, the Contractor will be barred from (a) <br /> asserting any claim for further adjustment of time an compensation arising out of, or <br /> relating to, the charges described in this Change Order or work described in Exhibit A <br /> and (b) asserting an equitable adjustment of time or price arising earlier that the date of <br /> this Change Order. This provision does not apply to requests for equitable adjustment <br /> of time or price for which the Contractor timely and properly provided notice of a <br /> differing site condition, protest, dispute, claim or Contract Claim as required by the <br /> Contract Documents. If the Contract Documents establish a time period for notice of a <br /> differing site condition, protest, dispute, claim, or Contract Claim that ends after the <br /> date of this Change Order, but relates to work performed prior to the date of this <br /> Change Order, then this provision does not apply if the Contractor timely and properly <br /> submits such notice <br /> 5. This Change Order only changes the contract between Contractor and City to the I <br /> extent explicitly provided herein. <br /> I <br /> 1 <br /> 1 <br /> I <br /> I <br /> I <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO# UP3620 00 63 65 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.