My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> ISPECIAL PROVISIONS GENERAL CONDITIONS <br /> IDOCUMENT 00 72 13 -GENERAL CONDITIONS <br /> TABLE OF CONTENTS <br /> IARTICLE 1 GENERAL INFORMATION 5 <br /> 1.1 Definitions of Words and Terms 5 <br /> 1 1.2 Contract Documents 9 <br /> 1.3 General 10 <br /> ARTICLE 2 SPECIFICATIONS AND DRAWINGS 10 <br /> 1 2.1 Interpretation of Specifications and Drawings - 10 <br /> 2.2 Division of Specifications and Drawings 11 <br /> I 2.3 Discrepancies in Specifications and Drawings 11 <br /> 2.4 Submittals 13 <br /> 2.5 Contractor's Copies of Contract Documents 13 <br /> IARTICLE 3 OWNER 13 <br /> 3.1 General 13 <br /> 1 3.2 Owner's Representative 14 <br /> ARTICLE 4 CONTRACTOR 15 <br /> I 4.1 CONTRACTOR'S REPRESENTATIVE 15 <br /> 4.2 CONSTRUCTION PROCEDURES 16 <br /> 1 4.3 SUBCONTRACTORS 16 <br /> 4.4 RESPONSIBILITIES 17 <br /> 4.5 CONTRACTOR'S EMPLOYEES 17 <br /> I4.6 PAYMENT FOR LABOR AND MATERIALS 17 <br /> 4.7 ATTENTION TO WORK 18 <br /> I4.8 SAFETY 18 <br /> 4.9 THREATS, INTIMIDATION AND HARASSMENT FORBIDDEN 18 <br /> I4.10 WEAPONS FORBIDDEN 18 <br /> 4.11 SAFETY STANDARDS 18 <br /> I4.12 PUBLIC SAFETY AND CONVENIENCE 19 <br /> 4.13 ACCESS TO WORK 19 <br /> I 4.14 EMERGENCIES 19 <br /> 4.15 TRENCH EXCAVATION 19 <br /> 4.16 OWNER-CONTRACTOR COORDINATION 19 <br /> I4.17 MEETINGS WITH OWNER 20 <br /> 4.18 COOPERATION WITH OTHERS 20 <br /> I <br /> Legion Golf Course Stormwater Detention Project November 28,2017 <br /> IWO#UP3620 00 72 13 - i <br />
The URL can be used to link to this page
Your browser does not support the video tag.