Laserfiche WebLink
. INSPECTION REPORT <br /> i Date to 2cZ i to Permit: v l`-')t 2 <br /> Contractor: cgA • <br /> Owner: s Ek-1/4-Pc- <br /> Site <br /> r \Site ddress: kg-3 v l ue • <br /> 1R(ti" C �•', MekECTION REQUESTED <br /> ELECTRIC � MECHANICAL PLUMBING <br /> ❑Temp Sery e •UFd ❑Groundwork/Slab ❑Groundwork/Slab <br /> Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> •Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> l SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Fina ❑Gaas PipeipFinal C G�❑HWT Final <br /> OTHER OR CONSULTATION:TYR--� (42•00 �/"� i - tl `® " <br /> APPROVAL 0 PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ K FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> • <br /> Inspector:_Ade‘ Date: J �� (� <br /> EIR(10/06) DATABAR,INC. <br />