McClean Iron Works Pier Project NGA File No. 7903B16 <br /> 2102 Ross Avenue October 28, 2016. <br /> Everett,Washington Page 3 <br /> (52 kips) at a deflection of less than 0.2 inch and based on those results, NGA recommended a design <br /> capacity of 22 tons(44 kips)at a refusal criterion of less than 2 inches of penetration per minute of driving. <br /> PRELIMINARY OPINIONS AND RECOMMENDATIONS <br /> It is our understanding that the plan is to drive 18-inch diameter pipe piles with a vibratory hammer, allow <br /> the excess pore water pressures to dissipate and the soils to gain strength and then to proof-test the piles by <br /> striking them with an impact hammer(air, steam, or Diesel). Culbertson Marine will install the piles. <br /> Piles will derive their support from both skin friction and end bearing. For design purposes,we assumed that <br /> fill below the water table and some of the looser alluvial silty sands will liquefy during a seismic event. Skin <br /> friction within the liquefied zones was neglected in the determination of the axial capacity of each pile. The <br /> axial capacities of the piles have also been reduced to account for the effects of down drag forces that might <br /> occur due to the dynamic settlement of the soils within and above the liquefiable zone. <br /> Based on our analyses,the recommended allowable axial capacity per pile is 50 tons,provided the piles are <br /> driven a minimum of 15 feet into medium dense sands found at depth, and meet a refusal criterion of less <br /> than 2 inches of penetration per minute of continuous driving with a vibratory hammer with an energy rating <br /> of 4,000 foot-pounds. Of the two vibratory hammers owned by Culbertson Marine,we recommend installing <br /> the pipe piles with the Foster 4000 vibratory hammer. The J & M 416L hammer appears to be slightly <br /> undersized for the pile size and is not recommended. <br /> The allowable pile capacity can be increased by 33 percent for dynamic loading conditions. To keep capacity <br /> reductions from group effects to a negligible amount, all piles should have a minimum center-to-center <br /> spacing of at least 3 pile diameters. <br /> Assuming that the subsurface soil and groundwater conditions at the pier location are similar to those <br /> encountered in the explorations by others, pile lengths of approximately 60 feet should be assumed. <br /> However, the composition of alluvial deposits commonly varies with location and depth and therefore <br /> subsurface conditions at the pier location could differ significantly. We note that the pin piles installed in <br /> 2008 and 2009 varied from approximately 34 feet to 107 feet in length and approximately 12 percent of the <br /> piles were longer than 60 feet. Accordingly,NGA recommends that a test pile be installed to evaluate pile <br /> capacity with depth of penetration and to confirm or revise the estimated pile length. The test pile should <br /> be installed within the pier footprint and located at a point that is the farthest away from any of the previously <br /> installed piles. <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br />