Laserfiche WebLink
McCLEAN IRON WORKS <br /> WELD INSPECTION REPORT <br /> Date: 1/5/2017 <br /> Project#/Name: 5547-Dock Inspector: Kevin Buck <br /> AWS-CWI t400111321 <br /> ❑FIELD I]SHOP WELDING 0 M.T. ❑P.T. 2 V.T. <br /> FILLER <br /> O Position: FLAT VERTICAL HORIZONTAL OVERHEAD METAL: ESAB DS70 Ultra Plus .045"Diameter <br /> ❑� Process: SMAW FCAW-G GMAW SAW <br /> j Weld Type: FILLET C.P. P.P. PLUG OTHER: <br /> B Weld Size: 3/16" 1/4" 5/16" 3/8" OTHER: 7/16",9/16" <br /> • Codes: AWS AISC RCSC ASTM UBC ASME <br /> Work performed in accordance with AWS-D1.1,IBC 1705.2,job specifications& requirements. <br /> 1)Verified filler meati to be used for welding meets the requirements of AISC 360 section A3.5 <br /> and AWS-A5.20. <br /> 2)Verified the following items for CP welded flangeconnections on 5002B1 and 5004B1: <br /> A) Fit up of connections prior to welding including wire wheeling of HAZ/weld zone to bare metal. <br /> B) Pre-heating of connection areas prior to welding. <br /> C) Root pass, in process inter-pass, and final visual inspections. <br /> D)Verification of WPS essential variables using a calibrated clamp meter. <br /> 3) Performed ultrasound inspection of CP welded connections. Refer to UT report dated 5JAN2017. <br /> 4)Visual inspection of 1/4"fillet weld connections were accpetable on 500561(4). <br /> All work was acceptable. <br /> 4::›6 <br /> CWI 00111321 <br /> QC1 EXP. 11/112018 <br /> 2102 Ross Avenue, Everett,WA 98201 Ph: 425.493.5525 Fax: 425.493.5520 Email: mcciron@mcciron.com <br />