Laserfiche WebLink
• <br /> • <br /> • <br /> McCLEAN IRON WORKS <br /> WELD INSPECTION REPORT <br /> Date: 1/16/2017 <br /> Project 8/Name: S547-Dock Inspector: Kevin Buck <br /> AWS-CW 1800111321 <br /> ❑FIELD Q SHOP WELDING ❑M.T. ❑P.T. ❑V.T. <br /> FILLER <br /> ❑., Position: FLAT VERTICAL HORIZONTAL OVERHEAD METAL: ESAB DS70 Ultra Plus .045'Diameter <br /> Q Process: SMAW FCAW-G GMAW SAW <br /> 2 Weld Type: FILLET C.P. P.P. PLUG OTHER: <br /> E Weld Size: 3/16" 1/4" 5/16" 3/8" OTHER: .4375" <br /> 2 Codes: AWS AISC RCSC ASTM UBC ASME <br /> Work performed in accordance with AWS-D1.1,IBC 1705.2,job specifications&requirements. <br /> 1)Verified the following items for CP welded w12 x 30 and w18 x 35 connections on 5004B1: <br /> A) Fit up of connections prior to welding including wire wheeling of HAZ/weld zone to bare metal. <br /> B) Pre-heating as required per AWS-D1.1 table 4.9. <br /> C)Verification of WPS essential variables with a calibrated clamp meter. <br /> D) Root pass, in process inter-pass,and final visual inspection of connections. <br /> 2) Performed ultrasound inspection of CP welded connections. Refer to UT report dated 16JAN2017. <br /> All work was acceptable. <br /> / NoPovin S Buck <br /> 7 <br /> q` CWI 00111321 <br /> ,, QC1 EXP. 11/1/2018 <br /> 2102 Ross Avenue, Everett,WA 98201 Ph: 425.493.5525 Fax: 425.493.5520 Email: mcciron@mcciron.com <br />